EP 424 End Prep Machine
68
Part No. 81-MAN-00, Rev. 0-0610
E.H. Wachs
the threads emerge through the back of the rear feed
assembly.
Figure 5-59. Turn the feed handle clockwise to
engage the mandrel threads in the feed nut.
Planning the Operation
Operating Envelope
Make sure you have adequate clearance around the work-
piece. See the operating envelope drawings in Chapter 3 for
reference.
Selecting Tool Holder
Two tool holders are provided with the single-point slide:
•
low-range (part no. 56-424-00), for pipe O.D. range
4.24”-23.62” (108-600 mm)
•
high-range (part no. 56-424-01), for pipe O.D. range
7.25”-24” (184-610 mm).
For most applications, you can use either tool holder. Make
sure you select one with a range that includes the O.D. of
the pipe you are machining.
Beveling O.D. Set-Back
The O.D. set-back is the distance from the end of the pipe
where you will start the beveling operation. It is determined
Содержание EP 424
Страница 2: ...EP 424 End Prep Machine Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Страница 8: ...EP 424 End Prep Machine 4 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Страница 14: ...EP 424 End Prep Machine 10 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Страница 92: ...EP 424 End Prep Machine 88 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Страница 98: ...EP 424 End Prep Machine 94 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Страница 100: ...EP 424 End Prep Machine 96 Part No 81 MAN 00 Rev 0 0610 E H Wachs...
Страница 107: ...WEIGHT 7 5 lbs 3 4 kg EP 424 Auto Feed Assembly 81 302 00 Contact E H Wachs for repair part information...