DW Guillotine
14
Part No. 29-MAN-10, Rev. A
E.H. Wachs
Do not lift the DW Guillotine
by yourself. The machine is
too heavy and bulky to be
lifted safely by one operator;
serious injury could result.
2.
Lift the machine out of the storage frame. It can be
lifted by two operators, using the handles.
Figure 3-2. Lift the machine out of the storage frame.
The bow is fully retracted (up)
when it is stored in the frame.
Mount the machine with the
bow retracted.
3.
Set the machine on the pipe at the cutting location,
with the saddle on a supported section of pipe. The
cutting wire will be toward the fall-off end of the pipe.
WARNING
NOTE
Содержание DW Guillotine
Страница 2: ...DW Guillotine Part No 29 MAN 10 Rev A E H Wachs...
Страница 4: ...DW Guillotine 2 Part No 29 MAN 10 Rev A E H Wachs...
Страница 40: ...DW Guillotine 36 Part No 29 MAN 10 Rev A E H Wachs...
Страница 50: ......
Страница 51: ......
Страница 52: ...455 Comanche Circle Harvard IL 60033 866 392 1060 www ehwachs com...