background image

 

MIO-R290GM2011 Rev E

 

G&B Specialties Inc. 535 West 3

rd

 Street, Berwick, PA, USA Tel: (570) 752-5901 Fax: (570) 752-6397 

US Field Service: 570-441-6988; CAN Field Service 570-854-0482www.rafna.com 

-189- 

 

Содержание R-290

Страница 1: ...ick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 1 RAFNA R 290 RAILGEAR 2011 to 2019 GM 2500 3500 Short Long Bed STANDARD IN CAB...

Страница 2: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 2 THIS PAGE INTENTIONALLY...

Страница 3: ...nty 15 Warranty Claim Form 16 Technical Service Bulletins 17 2 0 Wheel Kit Tire Pressure Monitoring System 27 Installation Safety Precautions 27 Installation of Aluminum Wheels TPMS Tire Stems and Tir...

Страница 4: ...Service of Railgear Kit 99 Railgear Over Center Adjustment 101 Rail Wheel Bearing Adjustment 102 Rail Sweep Adjustment 102 Rail Wheel Load Adjustment 103 Check each rail wheel load as follows 103 Adju...

Страница 5: ...5 Electrical System Troubleshooting 185 6 0 Steering Wheel Lock Kit 193 Installation Safety Precautions 193 Installation of Steering Wheel Lock 194 Operation Safety Precautions 197 Operating of Steeri...

Страница 6: ...CAN Field Service 570 854 0482 www rafna com 6 RAFNA CUSHION RIDE RAILGEAR OPERATION SERVICE AND PARTS MANUALS INSTALLATION MANUALS READ THESE MANUALS BEFORE INSTALLING THE RAILGEAR EQUIPMENT AND OR...

Страница 7: ...uld be reduced during inclement weather passing through road crossings switches frogs bridges and curves Curves of greater than 20 degrees should be negotiated with extreme caution Operation of this v...

Страница 8: ...lled railgear following the first eight 8 hours of rail travel inspect the rail wheel bearing end play as per the Railgear Kit Operation Service and Parts manual During this time the bearings will hav...

Страница 9: ...provided by an optional rail wheel brake package The RAFNA railgear is supplied with a group of Operation Service and Part Manuals and Installation Manuals which are specific to the railgear mounting...

Страница 10: ...n the vehicle match the serial numbers on this set of manuals and then ensure this entire set of manuals is given to the operator upon delivery of the vehicle GENERAL OPERATION INFORMATION The followi...

Страница 11: ...2 Braking ability on rail is considerably reduced and the brakes must be applied gradually to avoid skidding the vehicle wheels 3 Ensure that both the front and rear railgear are fully deployed 4 Ens...

Страница 12: ...6988 CAN Field Service 570 854 0482 www rafna com 12 GENERAL SERVICE INFORMATION If any technical service issues arise please contact the G B Specialties Inc Also please find attached the G B Special...

Страница 13: ...w and inspection by our firm or designated representative This warranty does not oblige G B Specialties to bear the Customer s cost of labor or transportation charges concerning the return of defectiv...

Страница 14: ...t incorrect parts have been shipped G B Specialties will cover all costs involved in replacing these parts and return of incorrectly shipped parts All warranty claims concerning short incorrect shipme...

Страница 15: ...ot received within 30 days a credit will not be issued Labor Warranty and or additional labor charges Either the G B Specialties Warranty or any of G B Specialties sub suppliers does not cover labor o...

Страница 16: ...End User Date of Purchase P O Number Ref Inv Address Ship to Address Inv Address Ship to Address Inv Address Ship to Address Inv Address Ship to Address Shipping instructions Standard Ground Special A...

Страница 17: ...5 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 17 TECHNICAL SERVICE BULLETINS PLEASE READ ALL OF THE FOLL...

Страница 18: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 18 THIS PAGE INTENTIONALLY...

Страница 19: ...INSTALLATION HARDWARE CAN CAUSE THE HARDWARE TO LOOSEN AND OR FAIL UNDER CERTAIN CIRCUMSTANCES ACTION ANY NYLOCK NUT THAT IS REMOVED FROM ANY PART OR COMPONENT OF ANY RAFNA RAILGEAR UNIT FOR ANY REASO...

Страница 20: ...f rail alignment rack two by fours or steel tubing Deploy railgear and observe or measure axle movement at the Axle Guide Pin Location You can have 1 8 of wear in both the up and down direction from c...

Страница 21: ...tems of concern which can create premature wear and failure to the axle in the area of the guide pin but not limited to are as follows Improper over center adjustment of the Railgear over center must...

Страница 22: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 22 AREA SUBJECT TO...

Страница 23: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 23...

Страница 24: ...to compress to dimensions shown to maintain a consistent distance across the head of the axle bolt and the axle Stover nut After the grommet has been compressed an additional washer must be added to a...

Страница 25: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 25...

Страница 26: ...GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 26 ALTERNATE INSPECTION...

Страница 27: ...instructions provided below only address the RAFNA railgear equipment Applicable railway company procedures and policies must be adhered to The road wheels and tires must be installed before the railg...

Страница 28: ...ation must be found for the spare wheel It cannot be mounted under the cargo box due to interference with the rear railgear 5 Install the wheels 6 Mount the wheels on the OEM hubs No wheel adapter is...

Страница 29: ...GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 29 Aluminum Wheel Insta...

Страница 30: ...290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 30 REF TPMS Installa...

Страница 31: ...290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 31 Ref TPMS Installa...

Страница 32: ...el and adapter torque decals to the outside face of the wheels 4 A new location must be found for the spare wheel and the necessary brackets fabricated It cannot be mounted under the cargo box due to...

Страница 33: ...nes and or any other component obstruction throughout the entire range of motion of the steering and suspension 9 Ensure that any vehicle modifications are done in accordance with the vehicle manufact...

Страница 34: ...90GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 34 Steel Wheel Instal...

Страница 35: ...19 5 tires that are recommended for RAFNA Railgear Wheel Modification Kit The OEM sensors cannot be reused as they are a snap in style that will not mount to the steel wheels supplied with RAFNA Wheel...

Страница 36: ...rmined by the operator of the vehicle depending on vehicle load and operating conditions Programming the TPMS It will be necessary to reprogram the vehicles computer to read the new sensor and the req...

Страница 37: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 37 Figure 1...

Страница 38: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 38 THIS PAGE INTENTIONALLY...

Страница 39: ...ge s Size mm English French 15261447 All GM 10 000 lbs Spanish Arabic 105 x 43 Chinese Requirements FMVSS CMVSS 110 Label Type Information Tire Pressure Label 109604 GS 48 SSA 1438 NOM 12 SCT2 TREAD A...

Страница 40: ...e ordered to have the OEM sensor included A screw on type valve stem that is secured to the steel wheel with a nut on the outside of the wheel is required and is supplied with this kit and is to be us...

Страница 41: ...e within its designed pressure range of 15 of inflated pressure before alerting the driver with a pressure warning light These are only recommended inflation pressures The proper tire pressure should...

Страница 42: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 42 Figure 1...

Страница 43: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 43 Figure 2...

Страница 44: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 44 Figure 3...

Страница 45: ...1 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 45 Figure 4 TORQUE TO 12 IN...

Страница 46: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 46 Figure 6...

Страница 47: ...ge s Size mm English French 15261447 All GM 10 000 lbs Spanish Arabic 105 x 43 Chinese Requirements FMVSS CMVSS 110 Label Type Information Tire Pressure Label 109604 GS 48 SSA 1438 NOM 12 SCT2 TREAD A...

Страница 48: ...below only address the RAFNA railgear equipment Applicable railway company procedures and policies must be adhered to Railway company rules governing rail travel must be observed at all times Before p...

Страница 49: ...exceeded SERVICE OF WHEEL KIT The wheels and tires must be serviced regularly to avoid damage to the equipment See Table 1 below for Service Recommendations If ever vibrations are felt through the veh...

Страница 50: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 50 THIS PAGE INTENTIONALLY...

Страница 51: ...t Applicable railway company procedures and policies must be adhered to Before performing any work under the vehicle or railgear ensure the engine is turned off and the parking brake is set Do not sta...

Страница 52: ...4 1 Remove the front bumper bumper mounting brackets and tow hooks Retain the bumper and bumper mounting brackets for re installation The tow hooks will not be re installed 2 THE BUMPER MOUNTING BRAC...

Страница 53: ...he railgear to the front mounting plates 9 Following the installation of the front railgear the front bumper will fit in its original position The front bumper will need to be trimmed modified as requ...

Страница 54: ...G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 54 FOR 2011 2014 GM HD TRUCKS SHIPPE...

Страница 55: ...E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 55 FOR 2011 2014 GM HD TRUCKS SHIP...

Страница 56: ...0GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 56 FOR 2015 2019 GM HD...

Страница 57: ...0GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 57 ALL GM HD TRUCKS 20...

Страница 58: ...G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 58 FOR 2011 2014 GM HD TRUCKS SHIPPE...

Страница 59: ...G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 59 FOR 2011 2014 GM HD TRUCKS SHIPPE...

Страница 60: ...0GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 60 FOR 2015 2019 GM HD...

Страница 61: ...ounting Bracket Passengers Side 1 R 2960 Railgear Mounting Shim Thick 4 R 2960A Railgear Mounting Shim 1 Thick 2 R 2631 Railgear Mounting Shim 2 Thick 2 H 00001 M18 Nylock Nut 2 H 00002 M14 Nylock Nut...

Страница 62: ...4 UNC Gr 8 Bolt x 3 50 Long 4 3 4 UNC Gr 8 Bolt x 4 50 Long 4 3 4 UNC Gr 8 Bolt x 5 50 Long 4 3 4 UNC Gr 8 Bolt x 6 50 Long 4 3 4 Gr 8 Type A Flat Washer 8 3 4 UNC Gr 8 Nylon Insert Lock Nut 4 1 Remo...

Страница 63: ...ow the mounting bolts to pass thru the brackets and allow the use of the OEM tow hitch mounting locations 10 The rear most tow hitch mounting bolt also secures the bumper mounting bracket to the vehic...

Страница 64: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 64 Long Bed Applica...

Страница 65: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 65 Long Bed Applica...

Страница 66: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 66 Long Bed Applica...

Страница 67: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 67 Long Bed Applica...

Страница 68: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 68 Long Bed Applica...

Страница 69: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 69 Long Bed Applica...

Страница 70: ...R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 70 Long Bed Applica...

Страница 71: ...290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 71 Short Bed Applica...

Страница 72: ...290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 72 Short Bed Applica...

Страница 73: ...290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 73 Short Bed Applica...

Страница 74: ...290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 74 Short Bed Applica...

Страница 75: ...or equipment damage Read and understand this manual completely before attempting operation of the railgear equipped vehicle Operating instructions provided below only address the RAFNA railgear equip...

Страница 76: ...ver operate the vehicle if the Gross Vehicle Weight Rating GVWR Gross Axle Weight Rating Front or Rear GAWR or the wheel or tire load ratings are exceeded SERVICE OF FRONT REAR MOUNTING KIT The front...

Страница 77: ...in severe bodily injury and or equipment damage Read and understand this manual completely before attempting installation of the equipment Installation instructions provided below only address the RAF...

Страница 78: ...Cab 1 R 2900B Railgear Assembly Full In Cab R 1600 Rail Wheel Assembly 2 R 21102D Rail Sweep 1 R 21102P Rail Sweep 1 R 990KIT 203 2 per UNC Gr 8 Bolt x 2 Long 8 4 Gr 8 Washer 16 8 UNC Gr 8 Nylon Inser...

Страница 79: ...cannot be achieved with the supplied shims the vehicle suspension will need to be modified This modification is not included with the RAFNA railgear 5 Position the railgear beneath the mounting plates...

Страница 80: ...it Operation Service and Parts manual Ensure the cylinder rod end lock nut is re tightened following this adjustment 14 Standard In Cab Controls Only 15 With the railgear fully raised to the road posi...

Страница 81: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 81...

Страница 82: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 82...

Страница 83: ...Lock Kit Part Number Description Qty P 00029 Actuating Lever Front 1 P 00028 Push Rod Front pre assembled 1 P 00023 Lock Pin pre assembled 1 P 00027 Clevis pre assembled 1 P 00030 Thrust Washer 1 R 99...

Страница 84: ...lock pin travel 6 Assemble the lever to the clevis with the clevis pin 7 Test the lock pin travel to ensure the lock pin is fully retracted 8 If necessary repeat steps 1 thru 7 9 Tighten the clevis ja...

Страница 85: ...o not force If the lock pin cannot be disengaged lower the railgear slightly Some railgear models have a lock cam converter installed to prevent the lock pin from engaging in the rail position in whic...

Страница 86: ...1 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 86 PARTS OF FRONT RAILGEAR L...

Страница 87: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 87...

Страница 88: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 88...

Страница 89: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 89...

Страница 90: ...3561 Spring pre assembled 1 P 00024 Tie Plate 1 R 5652A Knob 1 P 00034 Support Plate Upper Rod 1 R 990KIT 279 Installation Hardware Kit 1 1 Refer to the Railgear Kit installation manual that was ship...

Страница 91: ...ed it will start taking some of the vehicle s load If this is not the case DO NOT use the railgear Inspect the railgear for lubrication and damage 5 Continue lowering the railgear until the hydraulic...

Страница 92: ...M2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 92 PARTS OF REAR RAILGEA...

Страница 93: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 93...

Страница 94: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 94...

Страница 95: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 95...

Страница 96: ...equipment Applicable railway company procedures and policies must be adhered to Railway company rules governing rail travel must be observed at all times Ensure that the position and function of all r...

Страница 97: ...se the locking cable handle once the railgear has rotated past the road locked position 4 As the railgear is being deployed it will start taking some of the vehicle s load If this is not the case DO N...

Страница 98: ...f the railgear hydraulic system controls Placing the Vehicle on Rail To Lower the Railgear 1 Prior to approaching the rail crossing remove the manual safety lock pins from the front and rear railgear...

Страница 99: ...mended Service Schedule Service Required Daily Weekly Monthly 3 Months 6 Months 12 months Visually inspect the railgear for damaged or worn parts Check for loose rail wheels and fasteners re torque if...

Страница 100: ...lties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 100 Figure 1 Non Standard Fastener Torque Valu...

Страница 101: ...or in to decrease the over center angle Note that the cylinder rod can be turned instead of turning the rod end 3 Re deploy the railgear to the rail position and re check the over center angle Re adj...

Страница 102: ...pindle nut to 20 ft lbs Then loosen the spindle nut and re torque it to 6 ft lbs Re Check and re adjust the bearing end play if required If no torque wrench is available tighten the spindle nut until...

Страница 103: ...during vehicle annual FRA inspection As non permanent load is added to and or removed from the vehicle the rail wheel load will change also This is acceptable if the weight ratings of the vehicle axle...

Страница 104: ...630 1120 670 770 880 990 1110 1240 1370 1520 1660 1140 690 790 900 1010 1130 1260 1400 1540 1690 1160 700 800 910 1030 1150 1280 1420 1570 1720 1180 710 810 930 1050 1170 1310 1450 1600 1750 1200 720...

Страница 105: ...t of the axle to increase the rail wheel loads 4 Lower the railgear to the rail position and re check the rail wheel loads Re adjust the rail wheel loads if necessary 5 The distance between the top of...

Страница 106: ...h rail wheel is aligned by loosening the four fasteners which secure it to the railgear axle The rail wheel is then turned into alignment The four fasteners should then be tightened and torqued to 100...

Страница 107: ...as go no go gauges When placed on rail wheels they will indicate how much wear is still permissible or if the rail wheels need to be replaced The gauge for the R 290 model railgear can be ordered usi...

Страница 108: ...ear lock systems engage disengage smoothly 7 Lock cam converters installed on In Cab Controls models only 8 Safety lock pins installed on Full In Cab Controls models only 9 Railgear components clear a...

Страница 109: ...ack Miscellaneous Checks 30 All welded heated bare metal painted 31 Exterior railgear controls operate railgear correctly 32 In Cab controls operate railgear correctly ICC and FCC only 33 Emergency ha...

Страница 110: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 110...

Страница 111: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 111...

Страница 112: ...1 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 112 PARTS OF RAILGEAR KIT R...

Страница 113: ...O R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 113 R 2900A STD I...

Страница 114: ...O R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 114 R 2900A STD I...

Страница 115: ...1 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 115 R 2900D STD ICC WITH BRO...

Страница 116: ...1 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 116 R 2900D STD ICC WITH BRO...

Страница 117: ...1 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 117 R 2900D STD ICC WITH BRO...

Страница 118: ...IO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 118 R 2900B FICC...

Страница 119: ...IO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 119 R 2900B FICC...

Страница 120: ...IO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 120 R 2900B FICC...

Страница 121: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 121...

Страница 122: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 122...

Страница 123: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 123...

Страница 124: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 124...

Страница 125: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 125...

Страница 126: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 126...

Страница 127: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 127...

Страница 128: ...11 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 128 THIS PAGE INTENTIONALLY...

Страница 129: ...nsure that the hoses do not contact any sharp edges or hot surfaces When routing electrical wires ensure that the wires do not contact any sharp edges or hot surfaces All wire connections are to be so...

Страница 130: ...88 CAN Field Service 570 854 0482 www rafna com 130 If the emergency hand pump has been used to raise or lower the railgear ensure the manifold directional valve manual over rides are in the closed an...

Страница 131: ...ark each harness for reference in later assembly Figure 2 4 Remove the four screws that hold the cover and place the cover aside 5 Remove the black solder covers and separate all the soldered wires Do...

Страница 132: ...y 18 Fasten the pump back on to the mounting bracket using the same hardware that was fastened to the pump originally 19 Use Fig 3 as a guide to mount the pump assembly bracket with the pump assembly...

Страница 133: ...Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 133 Fig 1 HYDRAULIC PUMP MANIFOLD HYDRAULIC PUMP MANIFOLD ARE MOUNTED UNDER...

Страница 134: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 134 Fig 2...

Страница 135: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 135 Fig 3...

Страница 136: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 136 Fig 4...

Страница 137: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 137 Fig 5...

Страница 138: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 138 Fig 6...

Страница 139: ...battery tray weld 4 5 16 18 x 1 long hex bolts to the battery tray as shown Figure 3 2015 Newer Model Year DO NOT WELD SPARE BATTERY TRAY IT IS ALUMINUM 5 Install 4 Serrated Flange Hex Bolts and 4 Fla...

Страница 140: ...Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 140 Figure 1 2015 2019 MODEL YEAR REMOVE...

Страница 141: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 141 Figure 2 2011 TO 2014...

Страница 142: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 142 Figure 2A 2015 TO 2019...

Страница 143: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 143 Figure 3 2011 TO 2014...

Страница 144: ...011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 144 Figure 3A 2015 TO 2019...

Страница 145: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 145 Figure 4...

Страница 146: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 146 Figure 5...

Страница 147: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 147 Figure 6...

Страница 148: ...5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 148 Figure 7 HYDRAULIC PUMP P N S 003041 MANIFOLD P N S 003042 HYDRAULIC PUMP MANIFOLD HYDRAULIC PUMP...

Страница 149: ...T 018 1 4 Male O Ring Boss to 1 4 Male JIC 90 4 3 8 Male O Ring Boss to 1 4 Male JIC 90 1 1 4 Male O Ring Boss to 1 4 Male JIC 4 Hose 80 Long 2 Hose 33 Long 2 Hose 360 Long 2 1 4 Female JIC Straight C...

Страница 150: ...inder 7 Connect one 80 long hydraulic hose between the C2 port on the manifold and the rod end port on the front railgear cylinder 8 Connect one 33 long hydraulic hose between the P port on the manifo...

Страница 151: ...ct one wire from the vehicle s battery to the power terminal on the railgear pump solenoid b Connect another wire from the load terminal on the solenoid to the power terminal on the pump motor Use the...

Страница 152: ...ervice and Parts manuals for operation instructions e Refill the pump tank and repeat the above step until all air is removed from the rear hydraulic system f With both front and rear railgear locked...

Страница 153: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 153...

Страница 154: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 154...

Страница 155: ...Boss to 1 4 Male JIC 90 3 1 4 JIC Female x 3 8 Male O Ring Swivel 2 3 8 Male O Ring Boss to 1 4 Male JIC Straight 4 1 4 Male to 3 8 Male NPTF Straight 2 Hose 16 Long 2 Hose 33 Long 2 Hose 80 Long 2 H...

Страница 156: ...oriented while standing in front of the vehicle 6 Connect one 16 long hydraulic hose between the U2 port on the rear railgear cylinder check valve and the rod end port on the rear railgear cylinder 7...

Страница 157: ...the manifold through the firewall to the load terminal on the railgear switch on the In Cab Control panel c Connect another length of black wire from the power terminal on the railgear switch through...

Страница 158: ...e soldered heat shrink sealed enclosed in protective cable loom and secured with tie wraps 28 Ensure all holes in the firewall are sealed and protected with a grommet 29 Fill the hydraulic system and...

Страница 159: ...osition and ensure the lock cam converters previously installed prevent the lock pins from engaging the lock cams 34 Locate and store the hand pump handle and the locking cable holding collar in a sec...

Страница 160: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 160...

Страница 161: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 161...

Страница 162: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 162...

Страница 163: ...Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 163 Lock Cam Converter Instal...

Страница 164: ...Cab Control Panel 1 CO 071 10 Amp Circuit Breaker 1 CO 130N Front Gear Up Decal 1 CO 130O Rear Gear Up Decal 1 CO 130P Front Gear Down Decal 1 CO 130Q Rear Gear Down Decal 1 S 002001 Double P O Hydra...

Страница 165: ...gear cylinder 7 Connect one 23 long hydraulic hose straight and 90 ends between the C1 port on the manifold and the D1 port on the front or rear railgear cylinder check valve The 90 hose end should be...

Страница 166: ...nect another black wire from the Bat terminal on the circuit breaker to the power terminal on the solenoid e Connect another wire from the ground terminal on the railgear switch to a suitable ground l...

Страница 167: ...III or equivalent hydraulic fluid i Operate the front railgear up and down briefly to circulate the fluid and bleed the system of air refer to the Railgear Kit and Hydraulic Kit Operation Service and...

Страница 168: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 168...

Страница 169: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 169...

Страница 170: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 170...

Страница 171: ...r Pump Decal 3 CO 130N Front Gear Up Decal 1 CO 130O Rear Gear Up Decal 1 CO 130P Front Gear Down Decal 1 CO 130Q Rear Gear Down Decal 1 R 2868 Locking Cable Holding Collar 1 R 32145 Single P O Check...

Страница 172: ...CO 130O Rear Gear Up Decal 1 CO 130P Front Gear Down Decal 1 CO 130Q Rear Gear Down Decal 1 R 2868 Locking Cable Holding Collar 1 S 001030 Railgear Operation Decal 2 R 32145 Single P O Check Valve Ass...

Страница 173: ...le s battery to the power terminal on the circuit breaker or fuse b Connect another wire from the load terminal on the circuit breaker to the power terminal on the solenoid c Connect another wire from...

Страница 174: ...front and rear railgear locked in the road position fill the pump tank to the full line 15 Follow the Hydraulic System Relief Valve Setting procedure detailed in the Hydraulic Kit Service section of...

Страница 175: ...Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 175 Rear Mounted Pump Install Swap Front Labels with...

Страница 176: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 176...

Страница 177: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 177...

Страница 178: ...Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 178 Front Mounted Pump Install Swap Front Labels wit...

Страница 179: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 179...

Страница 180: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 180...

Страница 181: ...nd the parking brake is set Ensure all body parts and loose clothing are clear of any moving parts of the railgear Be aware of all pinch points Note that if the railgear is part way retracted or exten...

Страница 182: ...the movement of the railgear release the depressed button or return the handle to the middle position The pump must be de energized after use by turning off the respective dash switch At this point t...

Страница 183: ...ns are fully engaged as required by the procedure Operation of The Emergency Hand Pump Locking Manual Valve only 1 Remove the hand pump handle from storage and insert the handle into the hand pump loc...

Страница 184: ...ear pump body next to the emergency hand pump This relief valve protects the entire hydraulic system from over pressurization The relief valve will require adjustment if ever there appears to be inade...

Страница 185: ...The pump motor should run upon touching the shunt wire c If the pump does not run the pump is not properly grounded or the pump motor is defective d If the pump motor runs test for a defective soleno...

Страница 186: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 186...

Страница 187: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 187...

Страница 188: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 188...

Страница 189: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 189...

Страница 190: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 190...

Страница 191: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 191...

Страница 192: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 192...

Страница 193: ...severe bodily injury and or equipment damage Read and understand this manual completely before attempting installation of the equipment Installation instructions provided below only address the RAFNA...

Страница 194: ...e steering column cover and the steering wheel 4 Without removing the protective backing position the third adhesive back strip in a convenient location on the dash so that it does not interfere with...

Страница 195: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 195...

Страница 196: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 196...

Страница 197: ...equipment damage Read and understand this manual completely before attempting operation of the railgear equipped vehicle Operating instructions provided below only address the RAFNA railgear equipment...

Страница 198: ...d on the adhesive back strips the patch should restrict the steering wheel from turning Traveling on Rail a The steering wheel lock must be engaged at all times while on rail Removing the Vehicle from...

Страница 199: ...M2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 199 7 0 RAILGEAR KITS PA...

Страница 200: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 200...

Страница 201: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 201...

Страница 202: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 202...

Страница 203: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 203...

Страница 204: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 204...

Страница 205: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 205...

Страница 206: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 206...

Страница 207: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 207...

Страница 208: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 208...

Страница 209: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 209...

Страница 210: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 210...

Страница 211: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 211...

Страница 212: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 212...

Страница 213: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 213...

Страница 214: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 214...

Страница 215: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 215...

Страница 216: ...MIO R290GM2011 Rev E G B Specialties Inc 535 West 3rd Street Berwick PA USA Tel 570 752 5901 Fax 570 752 6397 US Field Service 570 441 6988 CAN Field Service 570 854 0482 www rafna com 216 NOTES...

Отзывы: