![VWR P2.H Series Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/vwr/p2-h-series/p2-h-series_user-manual_1057619056.webp)
21.4.
Command’s description
21.4.1. Zeroing
Syntax
Z CR LF
Possible answers:
21.4.2. Tarring
Possible answers
T_A CR LF
T_D CR LF
-
command accepted and in progress
-
command completed
T_A CR LF
T_v CR LF
-
command accepted and in progress
-
command comprehended but tare range overflow appeared
T_A CR LF
T_E CR LF
-
command accepted and in progress
-
time limit for stable result exceeded
T_I CR LF
- command comprehended but cannot be executed
21.4.3. Get tare value
Syntax:
OT CR LF
Possible answers:
OT_TARA CR LF
- command executed
Frame format:
1
2
3
4
5-6
7-15
16
17 18
19
20
21
T
O
space
stability
space
tare
space
unit
CR LF
Tare
- 9 characters with decimal point justified to the right
Unit
- 3 characters justified to the left
Содержание P2.H Series
Страница 1: ...VWR P2 H Series USER MANUAL...
Страница 2: ...AUGUST 2017...
Страница 8: ...8 4 MAIN DIMENSIONS...
Страница 10: ...10 2 Remove the hole plug 3 Fix the hook 4 Turn the scale bottom side down...
Страница 64: ......