Vulcan-Hart VMCS-101 Скачать руководство пользователя страница 3

GENERAL

INTRODUCTION

This manual is for the VMCS Heavy Duty Electric
Griddle Top. Procedures in this manual will apply to
all models listed on the cover page unless specified.
All of the information, illustrations and specifications
contained in this manual are based on the latest
product information available at the time of release.

OPERATION AND FIELD

INSTALLATION

For detailed field installation, operation and cleaning
instructions refer to F47658 Operation & Field
Installation Manual  sent with each unit. The manual
is also available online at www.vulcanequipment.com.

MODELS

Models

VMCS-101

*

Rapid Recovery™ composite griddle

plate cooking surface, 208V

VMCS-102

*

Rapid Recovery™ composite griddle

plate cooking surface, 240V

VMCS-201

Optional, Grooved steel griddle plate
cooking surface, 208V

VMCS-202

Optional, Grooved steel griddle plate
cooking surface, 240V

*

9⁄16" (15mm) thick fully welded Rapid Recovery

composite griddle plate (aluminum core interior with
304 Series stainless steel exterior) for fast
temperature recovery and even heating.

SPECIFICATIONS

ELECTRICAL

Model

Voltage

Power

1 Phase
AMP Draw

VMCS-101 208V

3.6 kW

17.3

VMCS-102 240V

3.6 kW

15.0

VMCS-201 208V

3.6 kW

17.3

VMCS-202 240V

3.6 kW

15.0

TOOLS

Standard set of hand tools.

Temperature tester with surface probe.

VOM with ability to measure micro amp current.
VOM with minimum of NFPA-70E CAT III 600V,
UL/CSA/TUV listed. Sensitivity of at least 20,000
ohms per volt. Meter leads must also be rated at
CAT III 600V.

Clamp on type amp meter with minimum of
NFPA-70E CAT III 600V, UL/CSA/TUV listed, for
measuring heating element current draw.

Special

Torque Wrench - Capable of measuring 20 in-lb.

Loctite® 242™

VMCS HEAVY DUTY ELECTRIC GRIDDLE TOP - GENERAL

Page 3 of 19

F45571 (0316)

Содержание VMCS-101

Страница 1: ...nd skills required to perform the procedure Procedures for which you do not have the necessary tools instruments and skills should be performed by a trained Vulcan Service Technician The reproduction...

Страница 2: ...LIGHTS 7 POWER CORD 8 HIGH LIMIT 8 CONTROL THERMOSTAT 9 HEATING ELEMENTS 11 ARM MECHANISM 12 SERVICE PROCEDURES AND ADJUSTMENTS 14 GRIDDLE TOP MANUAL LIFT CHECK 14 PLATE GAP ADJUSTER 14 THERMOSTAT TES...

Страница 3: ...te cooking surface 208V VMCS 202 Optional Grooved steel griddle plate cooking surface 240V 9 16 15mm thick fully welded Rapid Recovery composite griddle plate aluminum core interior with 304 Series st...

Страница 4: ...bolts NOTE Junction box is secured to the bottom of rear cover with screws and can remain attached Fig 2 3 Remove rear housing lid 1 Fig 3 and rear cover 2 Fig 3 Fig 3 4 Loosen bump stop bolt 1 Fig 4...

Страница 5: ...L BOX COVER B Note locations and disconnect power supply wires from terminal strip Fig 7 C Fully raise clamshell to access the left arm wireway cover on the bottom of arm Remove wireway cover 1 Fig 8...

Страница 6: ...g clamshell and rear housing from frame A Remove bolts securing rear housing to griddle frame Fig 11 B Remove clamshell from frame 9 Reverse procedure to install 10 Check for proper operation TOP CONT...

Страница 7: ...Reverse procedure to install NOTE Ensure that terminal connections are completely seated and tight 5 Check for proper operation INDICATOR LIGHTS Disconnect the electrical power to the machine and foll...

Страница 8: ...ht grommet in top control box through the upper pivot rod through rear housing wire path tube vertical to remove from machine 6 Reverse procedure to install 7 Check for proper operation HIGH LIMIT 1 R...

Страница 9: ...the control may occur 6 Check for proper operation CONTROL THERMOSTAT Disconnect the electrical power to the machine and follow lockout tagout procedures 1 REMOVE CLAMSHELL FROM FRAME 2 Remove control...

Страница 10: ...d and kink the capillary tube or damage to the control may occur A Position capillary bulb to the side 7 Remove the remaining 7 mounting nuts 3 Fig 28 from platen insulation retainer Fig 28 8 Lift pla...

Страница 11: ...ulation retainer 2 Fig 33 Do not bend and kink the capillary tube or damage to the control may occur A Position capillary bulb to the side 6 Remove the remaining 7 mounting nuts 3 Fig 33 from platen i...

Страница 12: ...ip Fig 35 B Fully raise clamshell to access the left arm wireway cover on the bottom of arm Remove wireway cover 1 Fig 36 from the bottom of left arm Fig 36 C Lower clamshell D Feed the power supply w...

Страница 13: ...ight off the upper pivot rod NOTE The arm handle is a loose fit between the arms and will fall away when either arm is removed 7 Reverse procedure to install 8 Check for proper operation VMCS HEAVY DU...

Страница 14: ...to prevent crushing of soft foods by the downward force of the unit Perform this procedure to manually check the raising and lowering operation of the griddle top 1 Grasp the handle Fig 40 and raise...

Страница 15: ...voltage A If voltage is incorrect find the source of the problem B If voltage is correct check current draw amps through the heating element lead wires NOTE This method is preferred over a resistance...

Страница 16: ...mber COMPONENT FUNCTION Power Switch Power switch turns griddle top ON and OFF Indicator Light Power Left amber light indicates when power switch is turned ON Indicator Light Thermostat Right amber li...

Страница 17: ...ower to heating element if temperature goes above 624 F A manual reset device after cool down Heating Element Heat source for griddle top WIRING DIAGRAM Fig 44 VMCS HEAVY DUTY ELECTRIC GRIDDLE TOP ELE...

Страница 18: ...stat malfunction 7 Heating element malfunction Unit will not raise or lower 1 Check spring mechanism and look for interference Food under cooked 1 Temperature set too low 2 Food not cooked long enough...

Страница 19: ...set too high or too low 2 Cooking surface needs to be cleaned See Operation Field Installation Manual 3 Cooking surface not covered with enough cooking oil 4 Cooking surface warn or damaged VMCS HEAVY...

Отзывы: