![Vulcan-Hart VMCS-101 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/vulcan-hart/vmcs-101/vmcs-101_service-manual_1056481011.webp)
11. Reverse procedure to install.
12. Check for proper operation.
HEATING ELEMENTS
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
1.
2.
Note wire tie locations and remove from capillary
tube and wire bundle.
3.
Note heating element wire locations (1, Fig. 31)
and disconnect from terminal strip.
Fig. 31
4.
Remove 12 screw (1, Fig. 32) securing platen
cover assembly (2, Fig. 32) to clamshell
assembly.
Fig. 32
5.
Remove mounting clips (1, Fig. 33) securing high
limit capillary bulb to platen insulation retainer (2,
Fig. 33).
Do not bend and kink the capillary tube or
damage to the control may occur.
A.
Position capillary bulb to the side.
6.
Remove the remaining 7 mounting nuts (3, Fig.
33) from platen insulation retainer.
Fig. 33
7.
Lift platen insulation and retainer from clamshell.
8.
Remove 16 mounting nuts (1, Fig. 34) securing
heating element retainer (2, Fig. 34) to platen.
Fig. 34
9.
Lift heating elements off the platen.
10. Reverse procedure to install.
11. Check for proper operation.
NOTE:
When installing heating elements, torque
mounting nuts to 20 in-lb.
NOTE:
When installing platen insulation, hand tighten
mounting nuts plus 1/2 turn to secure.
VMCS HEAVY DUTY ELECTRIC GRIDDLE TOP - REMOVAL AND REPLACEMENT OF PARTS
Page 11 of 19
F45571 (0316)