VTS  Euroheat DEFENDER 100 EHN Скачать руководство пользователя страница 4

4

EN

DEFENDER

 100-200 WHN

DEFENDER 

100-200 EHN

1.  INTRODUCTION 

1.1.   PRECAUTIONS, REQUIREMENTS, RECOMMENDATIONS 

Detailed analysis of this documentation, as well as assembly and use of equipment, according to the descriptions contained therein, and following all safety requirements, is the basis for the 

correct and safe operation of the device. Any other use that contradicts this instruction may cause accidents with serious consequences. Unauthorised personnel should have limited access 

to the device, while the personnel should be properly trained. The term operational personnel refers to people, who, as the result of completed training, own experience and knowledge of 

important standards, documentation and provisions, concerning safety and working conditions, have been authorised to carry out necessary work and are able to recognise potential hazards 

and avoid them. This technical documentation must be delivered together with the device. The documentation contains information concerning all possible configurations of air curtains. 

Examples of air curtain assembly and installation, as well as activation, use, repair and maintenance. Provided that the device is operated according to the intended use, this documentation 

contains a sufficient number of instructions, required by the qualified personnel. The documentation should be placed near the device and be readily available to the service team. The 

manufacturer reserves the right to introduce changes to the instruction, as well as changes to the device that affect its operation, without prior notice. VTS POLSKA Sp. z o.o. shall bear no 

responsibility for on-going maintenance, inspections, programming of equipment and damage, caused by standstills of equipment related to the waiting for warranty services, all and any 

damage related to the Client’s property, other than the device in question, as well as malfunctions that result from incorrect installation or improper use of the device.

DO NOT COVER
WARNING

: To avoid overheating - do not cover the device!

1.2.  TRANSPORT 

Prior to the installing and taking the device out of the cardboard box, it is required to check whether the cardboard box has not been damaged in any way and/or the adhesive tape (installed 

at the company) has not been broken off or cut. It is recommended to check whether the device’s casing has not been damaged in transport. Should any of the above situation occur, please 

contact us through telephone or e-mail: Tel. 0 801 080 073, email: [email protected], fax: (+48) 12 296 50 75. 

The device should be transported by two people. Use appropriate tools, when transporting the device, so as to avoid the damaging of goods and potential hazard to health.

1.3.   INITIAL STEPS TAKEN BEFORE THE INSTALLATION

Record the serial number of the device in the warranty card, prior to the commencement of the installation process. It is required to properly fill-in the warranty card, after the completion of the 

assembly. Prior to the commencing of any installation or maintenance work, it is required to disconnect power supply and protect it against unintentional activation.

2.   STRUCTURE, INTENDED USE, PRINCIPLE OF OPERATION

2.1.  INTENDED USE 

For the convenience of users as well as different types of installations in commercial and industrial facilities we have designed an air curtain in two different options and three sizes:

●  a DEFENDER 100 WHN curtain 1.0m wide with a water heater (8-11 kW, 1880 m

3

/h)

●  a DEFENDER 100 EHN curtain 1.0m wide with electric heaters (6 kW, 2150 m

3

/h)

●  a DEFENDER 150 WHN curtain 1.5m wide with a water heater (13- 19,5 kW, 3570 m

3

/h)

●  a DEFENDER 150 EHN curtain 1.5m wide with electric heaters (12 kW, 3500 m

3

/h)

●  a DEFENDER 200 WHN curtain 2.0m wide with a water heater (19- 28 kW, 4890 m

3

/h)

●  a DEFENDER 200 EHN curtain 2.0m wide with electric heaters (13,5 kW, 5000 m

3

/h)

The use of the DEFENDER 100-200 air curtain enables the leaving of the room door open, regardless of weather conditions, thus providing a protective barrier. The curtain also enables a 

simultaneous keeping of the required heating comfort inside the room/facility. The modern design of the DEFENDER 100-200 air curtain is a result of its wide range of application. The places in which 

it is possible to install the device include: malls, office buildings, supermarkets, cinema compleEHs, as well as shops, store-rooms, manufacturing facilities or warehouse rooms. Please notice that the 

use of an air curtain not only provides a protective barrier, but also it is an additional heat source in the room. 

APPLICATION:

 warehouse rooms, warehouses, sports facilities,

supermarkets, religious buildings, hotels, clinics, pharmacies, hospitals, office buildings, manufacturing facilities. 

PRIMARY ADVANTAGES:

 protection of climatic conditions in the room,

reduction of heating/cooling costs, universal size, ability to work both in vertical and horizontal position; simple, quick and intuitive assembly.

2.2.   PRINCIPLE OF OPERATION 

DEFENDER 100-200 WHN

  - heating medium, for example hot heating water, returns heat through a heat exchanger with a wide heat-exchange surface, thus providing high heating output (8-

28 kW). A transverse fan (1120-5000 m

3

/h) sucks in the air in the room, and pumps it through the heat exchanger, back into the room. The jet of warm air is directed downstream at high velocity, 

thus providing an air barrier.

DEFENDER 100-200 EHN

 - electric heaters (2000 and 1500W each) heat up, as a result of the flowing of electric current, and return the heat to the air; the air is blown off through the fan, which 

sucks in the air in the room. A jet of warm air is directed downstream at high velocity, thus providing an air barrier.

COLD AIR

HEATED AIR

2.3.   STRUCTURE (DEFENDERA 100-200 WHN, EHN) 

DEFENDER 100-200 WHN – WATER AIR 

CURTAIN 

1. Heat exchanger

2. Control system

3. Transverse fan

4. Casing

5. Outlet grille

6. Assembly jigs

7. Side cover

8. Side cap

DEFENDER 100-200 EHN – ELECTRIC 

AIR CURTAIN

1. Electric heaters

2. Control system

3. Transverse fan

4. Casing

5. Outlet grille

6. Assembly jigs

7. Side cover

8. Side cap

Содержание DEFENDER 100 EHN

Страница 1: ...EN Technical documentation DEFENDER 100 200 WHN DEFENDER 100 200 EHN DR ver 1 9 07 2014 Check us on...

Страница 2: ...DEFENDER 100 200 WHN DEFENDER 100 200 EHN...

Страница 3: ...E 6 SERVICING 6 1 PROCEDURE IN CASE OF DEFECTS 6 2 COMPLAINT PROCEDURE 7 INDUSTRIAL SAFETY INSTRUCTION 8 TECHNICAL DATA 8 1 WATER AIR CURTAIN DEFENDER 100 200 WHN 8 2 ELECTRIC AIR CURTAIN DEFENDER 100...

Страница 4: ...after the completion of the assembly Prior to the commencing of any installation or maintenance work it is required to disconnect power supply and protect it against unintentional activation 2 STRUCT...

Страница 5: ...n air capacities up to 5000 m3 h The control of the electric motor as well as thermal protections of the winding has been coupled with the control system which resulted in increasing safety of operati...

Страница 6: ...itive effect on curtain operation doors or windows that are constantly open in the room thus creating a draft presence of awning roofs etc on the outer side of the door constant and open access to sta...

Страница 7: ...nsists in attaching the installation handles to the unit 1 at regular intervals as in OPTION I In order to do so you should slide 2 DR 1m 3 DR 1 5m or 4 DR 2m assembly screws 2 M10x80 in each of the t...

Страница 8: ...In rooms with very high levels of dustiness In rooms with aggressive atmosphere due to the presence of copper and aluminium structural elements in the heat exchanger and electric heaters IMPORTANT The...

Страница 9: ...e Connection to the electric system must be performed by a duly authorized and qualified person Wire passes are located on the back side of the curtain 1 control wire packing 2 power wire packing The...

Страница 10: ...draining a few litres of water prior to the connecting of hydraulic conduits the supply conduits in particular It is advised to use vent valves in the highest point of the system It is recommended to...

Страница 11: ...ice DEFENDER 100 200 WHN EHN Circumstances in which the defect occurred remarks on the bill of lading inventory issue condition of cardboard Should the casing be defective it is required to present ph...

Страница 12: ...TRUCTION Special instructions concerning safety IMPORTANT Prior to the commencing of any work related to the device it is required to disconnect the system secure it properly and wait until the fan st...

Страница 13: ...0 24 0 20 0 10 0 08 p kPa 2 38 2 04 1 73 1 45 1 73 1 44 1 17 0 93 1 15 0 91 0 69 0 49 0 63 0 43 0 13 0 09 Flow rate of air at 1470 m3 h speed 2 air velocity at the output 7 6 m s noise level 58 dB A...

Страница 14: ...14 3 78 3 19 2 65 2 16 2 68 2 17 1 72 1 31 1 7 1 28 0 91 0 59 Parametry DEFENDER 200 WHN Tz Tp C 90 70 80 60 70 50 60 40 Tp1 C 5 10 15 20 5 10 15 20 5 10 15 20 5 10 15 20 Flow rate of air at 4890 m3...

Страница 15: ...5 1 30 3 Flow rate of air at 1290 m3 h speed 1 air velocity at the output 6 7 m s noise level 52 dB A Pg kW 3 6 6 0 3 6 6 0 3 6 6 0 3 6 6 0 Tp2 C 12 7 18 4 17 7 23 4 22 7 28 4 27 7 33 4 Parametry DEFE...

Страница 16: ...dB A Pg kW 10 8 13 5 10 8 13 5 10 8 13 5 10 8 13 5 Tp2 C 14 2 17 4 19 2 22 4 24 2 27 4 29 2 32 4 Flow rate of air at 2500 m3 h speed 1 air velocity at the output 5 5 m s noise level 54 dB A Pg kW 10 8...

Страница 17: ...10 13 5 19 5 19 28 6 0 12 0 13 5 Maximum flow rate m h 1880 3570 4890 2150 3500 5000 Maximum temperature of heating medium C 95 Maximum working pressure MPa 1 6 Water volume dm 0 5 0 85 1 2 Diameter...

Страница 18: ...g 27 4 26 9 37 4 36 6 48 4 47 2 25 7 35 4 45 6 Engine IP 20 EN Heating output at the opening of the valve water temperature of 90 C and temperature of inlet air 15 C Heating output in the heating mode...

Страница 19: ...he equipment is at zero voltage 4 Cover or isolate nearby components that are still live To energize the system apply the measures in reverse order Components The machines consist for the most part of...

Страница 20: ...nting of any cover shut down the electric power at least by disconnecting the main switch Electrical connection of the thermostat door switch valve actuator or control panel is to be carried out befor...

Страница 21: ...f installation Place of installation Detailed description of defect Contact person Name and surname Telephone E mail This field must be filled if the complaint notification refers to the following equ...

Отзывы: