![VP ShiniCube 1600TL Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/vp/shinicube-1600tl/shinicube-1600tl_user-manual_1052319034.webp)
Fig. 3-30: Press on the wiring terminal firmly
Fig. 3-31: Connect the AC cable reliably
4) Estimate the cable length, peel off the cable as per the length of the wiring part of the
OT cold pressed terminal, and press on the OT cold pressed terminal by a pair of press
pinchers;
5) Connect the cables respectively to terminals L, N and GND by a screw driver, in which,
GND is located on the shell of the inverter;
L
L
6) Tighten the waterproof AC terminal cover.
7)This step can be jumped over if the communication cable is to be connected. Check if
the AC and DC cables are reliably connected, record the cable colors and corresponding
functions, close the LCD panel and the bottom cover of the inverter if it is unnecessary
to connect the communication cable. Jump over the following part and turn to "3.6.5
Requirement for earthing".
Tip
To facilitate wiring operation and device maintenance, the
estimated cable length shall be 10cm longer than the actual
cable length to the terminal.
Installation
ShiniCube1600TL-3300TL User Manual
Victory Power New Energy
VP-UMSC1.0.0EN
25
/47
Содержание ShiniCube 1600TL
Страница 1: ...User Manual Operator 1600TL 2200TL 2800TL 3300TL Installer Maintainer EN PV Grid Tied Inverter...
Страница 2: ......
Страница 57: ......