
Packing Press 100 P2
Version: 111300001, M0004459B
Date: 13.12.2013
- 16 / 44 -
3 Transporting and setting up the machine / line
3.1 Notes on transporting
NOTE!
- Before transporting the machine/unit it must be shut down and the mains plug must be
disconnected!
- The machine / line must not be tipped over!
- To avoid any damage during transporting assemble transport security devices
if available.
- Fix the machine / unit in an orderly manner on the transporting device!
- Take into account the load dimensions under the applicable statutory road traffic regulations
and/or mark the load as required!
Fig. 3.1-1) Transporting the Packing Press 100 P2
F1 loads on cargo-securing means
2950 N oder 295 kg
F2 loading of foundation
2950 N/m² oder 2295 kg/m²
1
belt strap 1
2
belt strap 2
3
fastening points - foundation
4
transport pallet
WARNING AGAINST GENERAL DANGERS
Lifting fixtures (ropes, chains, belts) are to be fixed only to the points provided!
The lifting fixtures used must be at least compliant with the requirements for the loads as given
(see table above and the name / type plate on the lifting fixtures)!