Maintenance service, every 250
hours
Track unit, checking tension
NOTE!
Incorrect tension reduces the lifetime of the tracks.
A too low track tension increases the risk of
detracking.
1 Park the machine on horizontal ground.
2 Lower the dozer blade in the back to the ground
until the tracks are slightly raised (see picture).
3 Lower the bucket to the ground, operate the
boom until the machine is raised (see picture).
4 Run the tracks several times in forward and
reverse.
5 For rubber tracks, measure (on both tracks) sag
(A) under the roller which is the closest to the
center of the undercarriage, between the track
pad and the track roller.
6 The rubber track is correctly tensioned when a
sag (A) of 15 to 25 mm (0.59 to 0.98 in), target:
20 mm (0.79 in) is reached.
7 For steel tracks (only for EC18E/ECR18E),
measure (on both tracks) sag (B) from the frame
of undercarriage under a roller until the surface
of steel tracks.
8 The steel track is correctly tensioned when a sag
(B) of 110 to 120 mm (4.33 to 4.72 in), target:
115 mm (4.53 in) is reached.
V1087191
V1087192
A
Sag A for rubber tracks
V1199697
B
Sag B for steel tracks (only EC18E/
ECR18E)
Maintenance
Maintenance service, every 250 hours
161
Содержание EC15E
Страница 6: ......
Страница 10: ......
Страница 69: ...Never allow any person to walk or stand under raised equipment or suspended loads Operating instructions 67 ...
Страница 152: ...11 Radiator 12 Coolant filler neck 13 Air filter 14 Battery 15 Battery quick connector 150 Maintenance ...
Страница 169: ...Fuel system bleeding The machine has a self bleeding system Maintenance Maintenance service when required 167 ...
Страница 237: ......
Страница 238: ...236 Alphabetical index Ref No 20051662 A Volvo Eskilstuna English ...