5
Installation Guide - NiMH to Lithium
Need Help? Contact Us at (732) 967-9888 EXT: 230
Upgrading the Water Tech
TM
Volt FX-8Li Motor Box
STEP 7:
Turn the funnel / motor box / pole
attachment on its side (motor box opening facing
away from you). Place shell with three (3) screw
openings onto unit. Insert previously set aside screws
and tighten with drill or screwdriver.
STEP 8:
Turn the unit over and reattach the shell
with eight (8) screw openings onto unit. Insert
previously set aside screws into openings and
tighten with drill or screwdriver.
Note that there’s
no cover on top of button since the new motor
box is completely sealed.