iii
Control Circuit Protection ................................................................................................................................... 9-6
Thawing Timer .................................................................................................................................................... 9-7
Pumpdown ......................................................................................................................................................... 9-8
Removing Refrigerant ......................................................................................................................................... 9-8
Refrigerant Leaks ................................................................................................................................................ 9-9
Non-Condensable Gases ..................................................................................................................................... 9-9
Solenoid Valves ................................................................................................................................................. 9-10
Capacity Control Valves .................................................................................................................................... 9-11
Circulating Water Pump Motor ........................................................................................................................ 9-12
Cutter Gear Reducer ......................................................................................................................................... 9-12
Cutter Motor Replacement .............................................................................................................................. 9-13
Cutter Gear Reducer Removal and Replacement ............................................................................................. 9-13
Water Tank Removal ........................................................................................................................................ 9-14
Cutter and Bearing Removal and Reinstallation............................................................................................... 9-14
Crushed Ice Production .................................................................................................................................... 9-16
The Display ..................................................................................................................................................... A-1
Adjustment of Parameters in Order of Display .............................................................................................. A-2
Содержание Tube-Ice HFO10
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 16: ...2 4 Figure 3 Water Cooled Piping Schematic ...
Страница 17: ...2 5 Figure 4 Air Cooled Piping Schematic ...
Страница 36: ......
Страница 40: ......
Страница 43: ...6 3 Figure 16 Panel Layout 60 Hz Non CE Machines ...
Страница 44: ...6 4 Figure 17 Electrical Schematic Control Circuit All Voltages 50 Hz ...
Страница 45: ...6 5 Figure 18 Electrical Schematic Control Circuit All Voltages 60 Hz ...
Страница 46: ...6 6 Figure 19 Electrical Schematic 3 Phase Power All Voltages 50 Hz ...
Страница 47: ...6 7 Figure 20 Electrical Schematic 3 Phase Power All Voltages 60 Hz ...
Страница 68: ......
Страница 96: ......
Страница 110: ...Notes ...
Страница 111: ...Notes ...