10TA Service Manual
INDEX
5/30/14
12-2
H (Cont.)
High Head Pressure (Air-Cooled) ------------------------------- 8-10
High Head Pressure (Water Cooled) ---------------------------- 8-9
High/Low Pressure Switch ----------------------------------------- 9-4
History, Tube-Ice® --------------------------------------------------- 1-1
HMI, Interface -------------------------------------------------------- 10-5
Hub, Cutter Drive Gear -------------------------------------------- 9-21
I
Ice Bin Thermostat Location-------------------------------------- 3-13
Ice Capacity ---------------------------------------------------------- 11-3
Important Safety Notice --------------------------------------------- 1-2
Inspection, First Arrival --------------------------------------------- 2-1
Installation -------------------------------------------------------------- 3-1
Installation Review: A Checklist -------------------------------- 3-14
Introduction ------------------------------------------------------------ 1-1
J, K
L
Low Compressor Oil Level ----------------------------------------- 8-8
Low Ice Capacity ----------------------------------------------------- 8-7
Low Pressure Switch ------------------------------------------------ 9-4
Lubrication ------------------------------------------------------------ 7-6
Lubrication, Compressor ------------------------------------------- 7-6
Lubrication, Cutter Gear Reducer -------------------------------- 7-7
M
Machine Ratings (50 Hz., 24 HP) ------------------------------- 11-2
Machine Ratings (60 Hz., 21 HP) ------------------------------- 11-1
Machine Room -------------------------------------------------------- 2-1
Machine Won’t Run -------------------------------------------- 8-2, 8-3
Maintenance ----------------------------------------------------------- 7-1
Maintenance Program ---------------------------------------------- 7-1
Make-Up Water ------------------------------------------------------- 3-1
Manual Harvest Push Button -------------------------------- 5-2, 6-1
Metric Conversion --------------------------------------------------- 11-7
Mechanical Cleaning ------------------------------------------ 7-5, 7-6
N
NEMA ------------------------------------------------------------------- 2-1
Nomenclature, Piping ---------------------------------------------- 4-2
Non-Condensable Gases ----------------------------------------- 9-14
Normal Operating Vitals ------------------------------------------- 11-4
O
Oil Pressure Safety Control---------------------------------------- 9-9
Operating Tips -------------------------------------------------------- 5-3
Operation Vitals ------------------------------------------------------ 11-4
Optional Equipment, Power Monitor --------------------------- 10-2
Overload Protection, Cutter Motor Starter --- 6-2, 6-4, 6-5, 6-6
Overload Protection, Pump Motor Starter --- 6-2, 6-4, 6-5, 6-6
P
Pin, for Cutter Bearing --------------------------------------------- 9-20
Piping and Drain Connections ------------------------------------ 3-1
Piping Schematic, Air-cooled-------------------------------------- 4-4
Piping Schematic, Nomenclature -------------------------------- 4-2
Piping Schematic, Water cooled --------------------------------- 4-3
PLC (Programmable Logic Controller) ----------------- 10-4, 10-6
Poor Ice Quality ------------------------------------------------------- 8-6
Power Connection ---------------------------------------------------- 3-5
Power Monitor ------------------------------------------------------ 10-1
Preventive Maintenance -------------------------------------------- 7-8
Preventive Maintenance Program ------------------------------- 7-8
Preview ----------------------------------------------------------------- 1-1
Principle of Operation ----------------------------------------------- 4-1
Pump Down ---------------------------------------------------------- 9-12
Pump Overload Protection ----------------------- 6-2, 6-4, 6-5, 6-6
Pump, Contactor ------------------------------------ 6-2, 6-4, 6-5, 6-6
Q
R
R-22 (HCFC-22) ------------------------------------------ 1-2, 2-1, 5-1
R404A ------------------------------------------------------------------ 5-1
Receipt of Machine -------------------------------------------------- 2-1
Receiver ---------------------------------------------------------------- 4-1
Refrigerant Charge --------------------------------------------------- 5-1
Refrigerant Leaks -------------------------------------------- 5-1, 9-14
Refrigerant, Removal ---------------------------------------------- 9-13
Refrigeration System Review ------------------------------------- 5-1
Rotation Check -------------------------------------------------------- 3-6
S
Safety Notice ---------------------------------------------------------- 1-2
Safety Symbols and What They Mean-------------------------- 1-3
Safety Valves ---------------------------------------------------------- 2-1
Sanitizing Procedure ------------------------------------------------ 7-2
Shipping Papers ------------------------------------------------------ 2-1
Solenoid Valve ------------------------------------------------------ 9-15
Space Diagram (Air-Cooled Machine) -------------------------- 3-3
Space Diagram (Water Cooled Machine) ---------------------- 3-4
Special Precautions -------------------------------------------------- 1-2
Start Push Button (PB1) -------------------- 5-2, 5-3, 6-3, 6-4, 6-5
Start-Up ----------------------------------------------------------------- 5-2
Start-Up Checklist -------------------------------------------------- 3-15
Storage (prior to installation and start-up) --------------------- 2-2
Suction Cut-Off Unloader----------------------------------------- 9-16
Symptoms, Troubleshooting --------------------------------------- 8-2
T
Telephone Number, Vogt------------------------------------------- 1-1
Temperature-Pressure Chart ------------------------------------ 11-6
Thawing, Chamber --------------------------------------------------- 4-1
Thawing, Timer (T) ------------------------- 6-2, 6-4, 6-5, 6-6, 9-12
Thermostat, Bin Installation -------------------------------------- 3-13
Thermostat, Setup ------------------------------------------------- 3-14
Timer, Thawing------------------------------ 6-2, 6-4, 6-5, 6-6, 9-12
Trap (AC Piping) ---------------------------------------------------- 3-11
Troubleshooting ------------------------------------------------------- 8-1
U
Unloader - Loaded Operation (Freeze Period) ------------- 9-16
Unloader - Unloaded Operation (Harvest Period) --------- 9-16
Содержание P18FXT
Страница 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M08 10TA Model ...
Страница 10: ...10TA Service Manual TABLE OF CONTENTS vi BLANK ...
Страница 20: ...10TA Service Manual INTRODUCTION 4 14 14 1 10 BLANK ...
Страница 40: ...10TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 4 14 14 3 18 BLANK PAGE ...
Страница 43: ...10TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 4 14 2014 4 3 FIGURE 4 1 Water Cooled Piping Schematic ...
Страница 44: ...10TA Service Manual HOW YOUR TUBE ICE MACHINE WORKS 4 14 2014 4 4 FIGURE 4 2 Air Cooled Piping Schematic ...
Страница 50: ...10TA Service Manual START UP AND OPERATION 4 14 14 5 6 BLANK ...
Страница 51: ...10TA Service Manual ELECTRICAL CONTROLS 4 14 14 6 1 6 Electrical Controls FIGURE 6 1 Control Panel SS PB1 PB2 ...
Страница 52: ...10TA Service Manual ELECTRICAL CONTROLS 4 14 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 60: ...10TA Service Manual ELECTRICAL CONTROLS 4 14 14 6 10 BLANK ...
Страница 111: ...10TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 112: ...10 8 10TA Service Manual OPTIONS AND ACCESSORIES BLANK ...
Страница 120: ...10TA Service Manual TABLES CHARTS 7 2 14 11 8 BLANK ...
Страница 124: ...10TA Service Manual INDEX 5 30 14 12 4 ...