![Vivax ACP-09CH25AEF Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/vivax/acp-09ch25aef/acp-09ch25aef_service-manual_1038024023.webp)
20
Connect the charge hose with the push pin to the gas service port.
4. Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
8. Disconnect the charge set, and amount the 2-way and 3-way valve
’
s stem nuts and service port caps.
Use a torque wrench to tighten the service port cap.
Be sure to check for gas leakage.
6.6 Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
文件使用
"pdfFactory Pro"
试用版本创建
www.fineprint.cn
Содержание ACP-09CH25AEF
Страница 2: ......
Страница 12: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2 PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Страница 15: ...12 4 Refrigerant Cycle Diagram PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Страница 17: ...14 ACP 09CH25AEF ACP 12CH35AEF ACP 09CH25AEG ACP 12CH35AEG PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Страница 18: ...15 ACP 18CH50AEF ACP 18CH50AEG ACP 24CH70AEG ...
Страница 42: ......
Страница 43: ......
Страница 44: ......