
19
6. Turn the stem of the Hi valve about 45
°
counterclockwise for 6 or 7seconds after the gas coming
out, then tighten the flare nut again. Make sure the pressure display in the pressure indicator is a
little higher than the atmosphere pressure.
7. Remove the charge hose from the Lo pressure charge hose.
8. Fully open the Hi and Lo packed valve.
9. Securely tighten the cap of the packed valve.
Gas leak check
Soap water method
Apply soap water or a liquid neutral detergent on the indoor unit connections or outdoor unit
connections by a soft brush to check for leakage of the connecting points of the piping. If bubbles
come out, the pipes have leakage.
6.5 Pumping down (Re-installation)
Procedure
1. Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way
valve.
文件使用
"pdfFactory Pro"
试用版本创建
www.fineprint.cn
Содержание ACP-09CH25AEF
Страница 2: ......
Страница 12: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2 PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Страница 15: ...12 4 Refrigerant Cycle Diagram PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Страница 17: ...14 ACP 09CH25AEF ACP 12CH35AEF ACP 09CH25AEG ACP 12CH35AEG PDF 文件使用 pdfFactory Pro 试用版本创建 www fineprint cn ...
Страница 18: ...15 ACP 18CH50AEF ACP 18CH50AEG ACP 24CH70AEG ...
Страница 42: ......
Страница 43: ......
Страница 44: ......