![Vivax cool ACP-12CC35GECI Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/vivax-cool/acp-12cc35geci/acp-12cc35geci_service-manual_1038456067.webp)
A/A DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
88
Use the hexagonal socket spanner to rotate the element of liquid valve for 1/4 turns and use the screwdriver to
prop up the element of gas valve to discharge the gas.
Discharge the gas for 15 seconds, until refrigerant gas appears. The, immediately close the 1-way valve and
tighten the valve cap.
Open the element of liquid valve and gas valve to full (See Fig. 3-1-4).
Figure 3-1-4
Tighten the valve cap and then use soap water or leakage detector to check the connection between outdoor
unit and pipe for any leakage.
Caution
:
If possible, it is best to discharge the air out of the machine from the valve by using vacuum pump. To establish
vacuum by using vacuum pump, please operate as follows:
Take out the nut cover of the inlet for refrigerant.
Connect the tube of the vacuum watch with the vacuum pump, having the low-pressure end linking to the inlet
for refrigerant. (As shown in Figure 3-1-5)
Figure 3-1-5
Starting the vacuum pump, when the indicator turns to-1 bar, closing the low pressure handle and stopping
vacuumize. Keep for 15 minutes, ensuring the pressure of the vacuum watch remains.
Take out the valve cover of the gas valve together with the liquid valve.
Loosing the cord of liquid valve until the pressure rise to 0 bar.
Dismantle the tube from the cover of the inlet for refrigerant then, tighten the cover.
Loose the valve cord of the gas valve as well as the liquid valve entirely.
Содержание ACP-12CC35GECI
Страница 2: ......
Страница 3: ...GREE COMMERCIAL AIR CONDITION A A DC INVERTER U MATCH AIR CONDITIONERS 1 PRODUCT ...
Страница 15: ...GREE COMMERCIAL AIR CONDITION A A DC INVERTER U MATCH AIR CONDITIONERS 22 CONTROL ...
Страница 16: ...A A DC INVERTER U MATCH AIR CONDITIONERS CONTROL 23 CONTROL 1 OPERATION FLOWCHART 1 1Cooling Dry Operation ...
Страница 17: ...A A DC INVERTER U MATCH AIR CONDITIONERS CONTROL 24 1 2 Heating Operation ...
Страница 52: ...GREE COMMERCIAL AIR CONDITION A A DC INVERTER U MATCH AIR CONDITIONERS 59 5 3 7 Dimensions ...
Страница 53: ...GREE COMMERCIAL AIR CONDITION A A DC INVERTER U MATCH AIR CONDITIONERS 60 INSTALLATION ...
Страница 76: ...GREE COMMERCIAL AIR CONDITION A A DC INVERTER U MATCH AIR CONDITIONERS 99 MAINTENANCE ...
Страница 95: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 118 IPM module protection ...
Страница 96: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 119 DC busbar overvoltage protection ...
Страница 97: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 120 DC busbar undervoltage protection ...
Страница 98: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 121 Abnormal noise from PFC inductor ...
Страница 99: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 122 Radiator overheat protection ...
Страница 100: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 123 Tripping ...
Страница 172: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 224 Model ACP 24CC70GECI ACP 24CF70GECI Exploded View ...
Страница 176: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 242 Model ACP 12CC35GECI Exploded View ...
Страница 178: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 244 Model ACP 18CC50GECI Exploded View ...
Страница 182: ...A A DC INVERTER U MATCH AIR CONDITIONERS MAINTENANCE 249 Model ACP 36CC100GECI Exploded View ...
Страница 188: ......
Страница 189: ......
Страница 190: ......