INSTALLATION OF BATHTUBS
Installation of Bathtubs with panels
1
5
6
7
8
2
3
4
9
10
11
12
Points that Require Attention:
• We recommend the bathtub to be installed after tiling the wall tiles and other construction related works in the bathroom are completed.
• The technical details of the bathtub is provided in the Technical Data Sheet.
• Faucets should be installed as shown on the Technical Data Sheet.
• If a wall-mounted bathtub mixer is preferred the appropriate mixer should be installed on the wall in accordance with the instructions
provided in the Technical Data Sheet.
• It should be ensured that the floor tiles are even and the walls are straight (90 °) before starting installation.
• Cold and hot water connections must already be realized.
• If this is a hydromassage bathtub the electrical connection should be prepared as shown in the Technical Data Sheet.
1- The bathtub should be installed to a structurally prepared floor.
2- If the bathtub is purchased with a packaging on pallets, the leg sets must be installed to the bathtub. In this case the leg profiles are prepared to
be installed on the bathtub. The bathtub is placed upside down on a clean floor and the U shaped legs are inserted to the toggle and fixed to the
bottom of the product via two screws.
3- The toggle screws are tightened.
4- Remove the protective folio of the bathtub from its sides that are touching the wall and from the area around the siphon.
(Note: The remaining protective folio on the bathtub should be removed only after the bathtub installation and other construction works in the
bathroom are finished.)
5- Place the bathtub to the installation area.
6- Adjust and level the leg set according to the height of the panel. Check the evenness with a scale. (See the Technical Data Sheet for the panel
height).
7- Tighten the let sets nuts.
8- Mark the leg set installation holes (Caution! No hole should be drilled on heated and isolated floors!)
9- The points on the wall tiles which are marked for installing the wall hangers are drilled with a drilling machine (tip 10) and the wall hangers are
fixed (The technical details are given in the "Wall Hanger Details” section of the Technical Data Sheet.)
10- Prepare the bathtub siphon for installation. (At this stage do not forget to remove protective folio on the bathtub around the siphon hole.)
11- Apply silicone on the siphon drain seal and the bearing seal,
12- Install the bathtub siphon you’ve prepared.
Содержание Neon
Страница 5: ...ACRYLIC BATHTUBS Installation Applications and User s Manual ...
Страница 16: ......