13- It is not required to fix the leg set of the bathtub to the floor when wall hangers are used. However for non-straight walls .the bathtub leg set.
installation holes are drilled with a drilling machine (tip 7-8) (Caution: No hole should be drilled on heated and isolated floors.)
14- Screw the leg set to the floor.
15- The bathtub is fixed to the wall by tightening the cap screws of the wall hangers.
16- Siphon outlet is connected to the water drain. Perform leak proofing tests.
17- Panel supporting brackets are adjusted and screwed.
18-19- If the side panel will be used with the product, mark the floor where the panel supports are to be fixed and fix the panel supports to the floor
using silicone.
20- Remove the protective folio on the panels.
Note: If this is a hydro massage bathtub, the electrical connection should be made.
21- For rectangular bathtubs, first the side panel and later the front panel are installed to the bathtub. For corner bathtub panels, fixed metal clips are
available for panel installation under the front side rims of bathtub to fix the panel. The panel’s installation is started from one corner by attaching
the top band of the panel to these clips.
22- Silicone is applied between the bathtub and the wall in order to prevent any leakage
23- Additional edge lath application can be carried out if required. However isolation between wall and bathtub must be ensured before the
application of edge lath. The edge lath is installed by applying silicone along the length of both surfaces of the edge lath which will come into
contact with the bathtub and the wall.
24- The installation of the bathtub is complete. Any protective folio remaining on the bathtub should be removed only after all of the construction