10
10.
The last conductor pieces will be too long. Cut the last conductor
pieces to 5-10 cm with standard pliers:
11.
Then push both conductor line firmly in (thus activating the spring
load at the other end) and tighten the finger screws on each side of
the injector. Use e.g., a ruler in between your hand and the
conductor to make it more comfortable to apply sufficient
pressure.
12.
Cut the remaining conductor pieces off if needed.
13.
Screw two eye bolts into every suspension plate (for wire
attachment)
14.
Please firmly attach your own eyebolts or the like to the building structure.
The suspension hooks in LabRail kit accommodates can open and close
around up 5.5 mm.
Important: Each building eyebolt carries two wires and
should be placed between two rail connectors (except maybe the last set)
.
As gravity and symmetry holds the construction in place, wires should be
angled vertically about 30-60 degrees to the ceiling to improve stability.
Содержание LabRail
Страница 1: ...VISO SYSTEMS LabRail User Manual Revision 17DEC2021 ...
Страница 25: ...25 Specifications Coming soon ...