Install the Chassis
and Cab Cabling
Install the cabling to connect the junction boxes and air
transducer interface boxes to the meter in the cab.
When more than one junction box is used mark both
ends of each signal cable so that each cable and
therefore junction box can be identified at the meter.
Use a Y Splitter Cable to connect each signal cable
to the meter.
Securing Excess Cable
For cables that are longer than they need to be you will
need to loop them and retain them using cable ties.
Note:
If you are installing a system on a semi-truck you will
need to refer to the sections for installing the truck to
trailer cable.
Fig 1.48
Step 1.
If possible have the cable in a clear section of chassis.
Fig 1.49
Step 2.
Loop the excess cable back on itself to form a bundle and
cable tie.
Fig 1.50
Step 3.
Add extra ties, tension and cut off excess.
Fig 1.51
Step 4.
Now attach the cable bundle to a convenient support.
Fig 1.52
Step 5.
Tension the cable ties and cut off the excess.
Fig 1.47
SI Onboard TruckWeigh™ Manual
Installation
Содержание VPG On-Board Weighing SI Onboard TruckWeigh
Страница 5: ...5 Installation SI Onboard Installation SI Onboard TruckWeigh Manual Installation ...
Страница 23: ...23 Setup Setup SI Onboard TruckWeigh Manual ...
Страница 36: ...36 Installation SI Onboard SI Onboard TruckWeigh Manual Setup ...
Страница 37: ...37 Calibration Calibration SI Onboard TruckWeigh Manual ...
Страница 42: ...42 SI Onboard TruckWeigh Manual Calibration ...
Страница 43: ...Appendices Appendices SI Onboard TruckWeigh Manual ...
Страница 58: ...58 SI Onboard TruckWeigh Manual Notes ...
Страница 59: ......