Evolution Wine Wall Post
Installation instructions for floor-to-ceiling post for Wine Wall racking
• 1 Post base
• 1 Post top
• 24 Self-drilling screws
• Drill bit
• Phillips head driver/drill
• Level
• Pencil
• Tape measure
• Metal cutting saw
• Metal file
Parts List
Required Tools
Fasteners:
Fasteners for securing racks to the Wine Wall Posts are provided (self-drilling screws).
Each mounting plate is pre-drilled for installing to the ceiling or floor. Please use the following recommendations
for fasteners:
• Drywall: Attach to joists or wood backing when available with a #8 X 1¼” course thread screw or larger or
use expanding hollow wall anchors with at least #8 screw size
• Wood: Use #8 X 1¼” course thread screws or larger
• Concrete, Brick or Stucco: 3/16” x 1¼” masonry screw or #8 x 1¼” screw with appropriate size expand-
ing concrete anchor
Figure A
Figure B
1. Build Wine Wall Racking:
Follow instruc-
tions provided with Evolution Wine Wall racking (sold
separately) to assemble required racking for project.*
2. Measure ceiling height and mark Post:
Measure the ceiling height in the place where the
post is to be installed. Lay each section, interlaced, as
shown above (Figure A). Position the post so that the
measurement from top to bottom of the base plates
equals your ceiling height. Mark the top post section.
3. Cut Post:
Using a reciprocating saw, band
saw or hack saw, squarely cut Post at marks from
Step 2 (Figure B). Repeat steps 2 and 3 for second
post.
Don’t use abrasive saws as they may damage finish!
* See following page for instructions using Extensions