Initial start-up, inspection and maintenance
Further details regarding the individual steps
(cont.)
Pushing turbulators into boiler and securing boiler door and
clean-out cover with screws
Please note:
Refit the gas supply pipe on gas burners.
¨
ĂSafety instruction
Carry out a leak test on all gas supply connections.
A
Only for 320 to 860ĂkW:
Insert the respective number of turbulators into each hot gas channel of
the
third
flue (see page 15); in doing so, push the first turbulator element
approx.
h
into the hot gas channel, hook in the second and third element
and push in.
B
Tighten the screws on the boiler door evenly and diagonally.