3.7 Controller for boiler sequence control/charging control panel
Charging control panel without boiler sequence control
For part no., see pricelist
This charging control panel is used to activate the shared discharg-
ing and conveying equipment of a twin boiler system without boiler
sequence control.
Boiler sequence control incl. buffer management is carried out by an
on-site higher ranking control system (e.g. building management
system).
Note
Required for each boiler system:
■ Output signals 0-10 V
■ External demand ON/OFF
Required for each drive (e.g. discharge, screw conveyors):
■ External drive switching (with or without light barrier)
Charging control panel with boiler sequence control
For part no., see pricelist
This charging control panel is used to activate the shared discharg-
ing and conveying equipment of a twin boiler system with boiler
sequence control, incl. buffer controller.
Note
Required for each drive (e.g. discharge, screw conveyors):
■ External drive switching (with or without light barrier)
Buffer controller with boiler sequence control
For part no., see pricelist
This buffer controller is used to control buffer management in twin
boiler systems.
The Ecocontrol regulates buffer management incl. boiler sequence
control.
Note
The boiler systems each have their own fuel charging system (dis-
charge and conveying equipment).
Control unit
(cont.)
VITOFLEX 300-UF
Viesmann
25
5682428
3