![Viessmann VD2-1080 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/viessmann/vd2-1080/vd2-1080_installation-instructions-manual_1016938017.webp)
17
5285 429 - 03
Vitorond 200, VD2 Series 320 to 1080 Installation
Assembly
Water Distribution Pipe and Drain Installation
1. To assemble the water distribution pipe, pipe together
- rod end and extension rod and secure with supplied
sheet metal screws.
Number and length of the rods vary for different
boiler sizes.
- Mount gasket on flange rod and secure flange rod
with supplied brass screws.
2. Slide water distribution pipe through lower nipple
ports.
3. Insert supply nipple into R
c
in. opening on rear cast
iron section and install supplied fill and drain valve.
IMPORTANT
Ensure that distribution pipe openings are facing
upward.
Ensure that distribution pipe openings are facing upward.
Front section
“a” max, of
9
/
32
in. (7 mm).
R 2 in.
plug
Rear section
R
c
in.
4. Apply hemp and pipe dope to R 2 in. plugs and insert
into openings in the front section as shown.
5. Tighten R 2 in. plugs into front section using a 1 in.
square pipe tube or a 1” ratchet. Ensure that R 2 in.
plugs do not protrude beyond a maximum of
9
/
32
in.
(7
mm).
IMPORTANT