background image

GB

General notice (liability): the details of this technical documents serve for description. Consents regarding the availability of certain features or
regarding a certain purpose always require a special written agreement.

Page 8 GB 

 

 

Right reserved to make technical changes!

GB

3.3   Assembly of the wall panels

 

 

Clean the interior flooring panel in the area of the interior 

 

  wall plating C with isopropanol. Adhere the enclosed sealing

 

  gasket (D) to the cleaned edge of the interior flooring plate.

 

  Remove the protective foil from the sealing gasket.

 

  Begin the wall assembly with the corner panels. Connect the

 

  panels using the cam locks.

3.4   Assembly of the door

 

 

The one piece door is supplied complete with the door 

 

  frame.

 

 

During assembly ensure that the doorframe is installed 

 

  perfectly horizontally and vertically (plumb Iine).

3.5   Assembly of the ceiling panels

 

 

When installing a wall-hanging unit, it must be hung on the  

 

  side section of the door frame or on the wall before 

 

  installing the ceiling elements. During installation ensure  

 

  that the evaporator fan does not blow onto the door leaf and  

 

  the pressure compensation valve.

 

  Place the ceiling panels in position and tighten the cam

 

  locks.

 

     

Note!

 

 

lf the panels are uneven, release the cam locks and adjust

 

  the panels. Tighten all cam locks (wall/ceiling, wall/wall, 

 

  wall/floor) again.

3.6   Assembly of the door threshold

 

 

Place the stainless steel door threshold (G) in the middle of

 

  the door opening and adjust. Drill holes for fastening of the

 

  door threshold (ø 3.3 mm)

 

   

Do not drill extra holes due to possible heating

 

   

cable underneath. Danger to life!

 

  In order to seal the threshold securely against penetrating 

 

  damp, apply a bead of polyurethane sealant (L) to the front

 

  of the door sill at the bottom, on the inside and on the sides.

 

  Place door threshold plate on the flooring panel, adjust and

 

  rivet in place using enclosed rivets.

 

  Seal the threshold with PU sealant on the sides of the door

 

  opening and to the floor.

 

  Smooth off excessive sealant.

D

C

Montage Wand - Ceiling

Montage Türschwelle

Содержание TectoCell Compact 100

Страница 1: ...o Any work on the electrical parts of the coldroom must be assembling or commissioning the unit Your specialist done by qualified electricians The plug must be separated refrigeration technician will...

Страница 2: ...embly 3 1 Connecting the coldroom panels 3 2 Assembly of the flooring panels 3 3 Assembly of the wall panels 3 4 Assembly of the door 3 5 Assembly of the ceiling panels 3 6 Assembly of the door thresh...

Страница 3: ...or installing a ceiling refrigeration unit or other elements such as hanging rails pipes etc additional support must be provided during assembly Attention During installation of the refrigeration uni...

Страница 4: ...ial prop construction Before starting to install the device check the dimensions of the intended place of installation With this also the right angularity has to be checked by diagonal measurement lt...

Страница 5: ...a distance of 200 to 300 mm from each other Ensure that the joins B and the exterior edges A are placed exactly on the flooring gratings lf there is unevenness in the flooring the flooring gratings mu...

Страница 6: ...be done carefully to prevent any and all penetration by water or contamination The individual coldroom elements are labelled The respec tive position of each coldroom element can be ascertained by com...

Страница 7: ...g panels with one or two sided connections fill the points marked on the drawing with sealant Do not place weight on the panel to be assembled Push the flooring panels together and tighten the externa...

Страница 8: ...the side section of the door frame or on the wall before installing the ceiling elements During installation ensure that the evaporator fan does not blow onto the door leaf and the pressure compensat...

Страница 9: ...the cap in order to release the cap locking After releasing the screw P or R the door can be adjusted horizontally or depthwise For vertical adjustment turn the screws of the rising hinges T so that t...

Страница 10: ...nels which are screwed onto the floor of the room in which the coldroom is assembled These are constructed such that they form a seal with the floor of the building During assembly the wall panels are...

Страница 11: ...Open the distributor s lead through opening and insert enclosed grommet Insert the power supply lead into the grommet and secure to L1 N and PE in the distributor Connect to power supply The power le...

Страница 12: ...m the side of the outside handle using a 2 5 mm hexagon key L Insert key H into the cylinder F turn to the horizontal position with turn and remove cylinder lock with key Install in reverse sequence T...

Страница 13: ...eaning the refrigeration unit and the coldroom should be cut off from the power supply Remove the plug from the power supply during such work and secure against the plug being reinserted or switch off...

Страница 14: ...adiation from the sun will increase power use Allow warm food to cool down to room temperature before placing it the coldroom Avoid keeping the door open for longer than necessary Monitor temperature...

Страница 15: ...ils of this technical documents serve for description Consents regarding the availability of certain features or regarding a certain purpose always require a special written agreement Page 15 GB Right...

Страница 16: ...Middle East FZE Telephone 971 43724247 refrigeration viessmann ae www viessmann ae United Kingdom Viessmann Refrigeration Systems Limited Telephone 44 1952 457157 sales viessmann coldtech co uk www v...

Отзывы:

Похожие инструкции для TectoCell Compact 100