background image

GB

General notice (liability): the details of this technical documents serve for description. Consents regarding the availability of certain features or
regarding a certain purpose always require a special written agreement.

Page 2 GB 

 

 

Right reserved to make technical changes!

GB

1.    Gerneral notes 

1.1    Area of validity
1.2    Extract from the conditions of guarantee
1.3    Supplied condition
1.4    Unpacking and Handling
1.5    Assembly of the coldroom
1.6    Disposing of the coldroom
 

 

2.    Preliminary work

2.1    Compensation for uneven floor
2.2    Coldrooms with flooring ventilation
 

  (Coldroom temperature under - 5°C)

2.3    Coldrooms without flooring ventilation

3.    Coldroom assembly

3.1    Connecting the coldroom panels
3.2    Assembly of the flooring panels
3.3    Assembly of the wall panels
3.4    Assembly of the door 
3.5    Assembly of the ceiling panels
3.6    Assembly of the door threshold
3.7    Removing transportation securing plates
3.8    Adjusting the hinges
3.9    Door lock fastener
3.10   Mechanical works on the door or the hatch
3.11   Coldroom without flooring panels
3.12   Closing the operational openings of the cam locks in the
 

  wall and ceiling panels 

 

 

4.    Electrical connections

5.    Miscellaneous

5.1    Replacement of cylinder lock on rotary handle lock
5.2    Emergency release

6.    Commissioning

6.1    Commissioning the coldroom
6.2    Permissible loads for flooring panels
6.3    Deactivation
6.4    Cleaning the coldroom

7.    Energy saving and storage of refrigerated products

7.1    Notes on energy savings
7.2    Storing refrigerated goods

 

 

Table of contents

Содержание TectoCell Compact 100

Страница 1: ...o Any work on the electrical parts of the coldroom must be assembling or commissioning the unit Your specialist done by qualified electricians The plug must be separated refrigeration technician will...

Страница 2: ...embly 3 1 Connecting the coldroom panels 3 2 Assembly of the flooring panels 3 3 Assembly of the wall panels 3 4 Assembly of the door 3 5 Assembly of the ceiling panels 3 6 Assembly of the door thresh...

Страница 3: ...or installing a ceiling refrigeration unit or other elements such as hanging rails pipes etc additional support must be provided during assembly Attention During installation of the refrigeration uni...

Страница 4: ...ial prop construction Before starting to install the device check the dimensions of the intended place of installation With this also the right angularity has to be checked by diagonal measurement lt...

Страница 5: ...a distance of 200 to 300 mm from each other Ensure that the joins B and the exterior edges A are placed exactly on the flooring gratings lf there is unevenness in the flooring the flooring gratings mu...

Страница 6: ...be done carefully to prevent any and all penetration by water or contamination The individual coldroom elements are labelled The respec tive position of each coldroom element can be ascertained by com...

Страница 7: ...g panels with one or two sided connections fill the points marked on the drawing with sealant Do not place weight on the panel to be assembled Push the flooring panels together and tighten the externa...

Страница 8: ...the side section of the door frame or on the wall before installing the ceiling elements During installation ensure that the evaporator fan does not blow onto the door leaf and the pressure compensat...

Страница 9: ...the cap in order to release the cap locking After releasing the screw P or R the door can be adjusted horizontally or depthwise For vertical adjustment turn the screws of the rising hinges T so that t...

Страница 10: ...nels which are screwed onto the floor of the room in which the coldroom is assembled These are constructed such that they form a seal with the floor of the building During assembly the wall panels are...

Страница 11: ...Open the distributor s lead through opening and insert enclosed grommet Insert the power supply lead into the grommet and secure to L1 N and PE in the distributor Connect to power supply The power le...

Страница 12: ...m the side of the outside handle using a 2 5 mm hexagon key L Insert key H into the cylinder F turn to the horizontal position with turn and remove cylinder lock with key Install in reverse sequence T...

Страница 13: ...eaning the refrigeration unit and the coldroom should be cut off from the power supply Remove the plug from the power supply during such work and secure against the plug being reinserted or switch off...

Страница 14: ...adiation from the sun will increase power use Allow warm food to cool down to room temperature before placing it the coldroom Avoid keeping the door open for longer than necessary Monitor temperature...

Страница 15: ...ils of this technical documents serve for description Consents regarding the availability of certain features or regarding a certain purpose always require a special written agreement Page 15 GB Right...

Страница 16: ...Middle East FZE Telephone 971 43724247 refrigeration viessmann ae www viessmann ae United Kingdom Viessmann Refrigeration Systems Limited Telephone 44 1952 457157 sales viessmann coldtech co uk www v...

Отзывы:

Похожие инструкции для TectoCell Compact 100