background image

GB

General notice (liability): the details of this technical documents serve for description. Consents regarding the availability of certain features or
regarding a certain purpose always require a special written agreement.

Page 10 GB 

 

 

Right reserved to make technical changes!

GB

3.10  Mechanical works on the door or the hatch
 

   

 

 

 

   

Important! 

 

  For door and view hatch panels, mechanical work in the

 

  marked area (e.g. drilling, sawing) is prohibited.  This

 

  applies both for the exterior and for the interior.

 

  Electrical components have been foamed in here. 

 

  Danger to life may result from damaging the integrated

 

  electrical wires!

3.11  Coldroom without flooring panels

 

  The wall panels are placed in plastic U-channels which are

 

  screwed onto the floor of the room in which the coldroom is

 

  assembled. These are constructed such that they form a seal

 

  with the floor of the building. During assembly the wall

 

  panels are either riveted to the U channels or screwed onto 

 

  them.

 

   

Caution!

 

  To avoid damage to the floor of the building, ensure prior to

 

  drilling in the floor that the cement coating does not 

 

  contain an damp proof layer which might be damaged. In 

 

  addition, the drill holes must be placed such that they are

 

  not under the cam locks of the panels.

 

  The door panel without flooring 

is supplied with transport

 

  securing plates and without door frame heating. Remove

 

  transport securing plates for assembly of the door.

3.12  Closing the operational openings of the cam locks in the
 

  wall and ceiling panels

 

 

Fill the openings with the insulating foam fillers supplied (D) 

 

  and seal with plastic plugs (E).

12 mm

a

aaa

aa

D

E

Содержание TectoCell Compact 100

Страница 1: ...o Any work on the electrical parts of the coldroom must be assembling or commissioning the unit Your specialist done by qualified electricians The plug must be separated refrigeration technician will...

Страница 2: ...embly 3 1 Connecting the coldroom panels 3 2 Assembly of the flooring panels 3 3 Assembly of the wall panels 3 4 Assembly of the door 3 5 Assembly of the ceiling panels 3 6 Assembly of the door thresh...

Страница 3: ...or installing a ceiling refrigeration unit or other elements such as hanging rails pipes etc additional support must be provided during assembly Attention During installation of the refrigeration uni...

Страница 4: ...ial prop construction Before starting to install the device check the dimensions of the intended place of installation With this also the right angularity has to be checked by diagonal measurement lt...

Страница 5: ...a distance of 200 to 300 mm from each other Ensure that the joins B and the exterior edges A are placed exactly on the flooring gratings lf there is unevenness in the flooring the flooring gratings mu...

Страница 6: ...be done carefully to prevent any and all penetration by water or contamination The individual coldroom elements are labelled The respec tive position of each coldroom element can be ascertained by com...

Страница 7: ...g panels with one or two sided connections fill the points marked on the drawing with sealant Do not place weight on the panel to be assembled Push the flooring panels together and tighten the externa...

Страница 8: ...the side section of the door frame or on the wall before installing the ceiling elements During installation ensure that the evaporator fan does not blow onto the door leaf and the pressure compensat...

Страница 9: ...the cap in order to release the cap locking After releasing the screw P or R the door can be adjusted horizontally or depthwise For vertical adjustment turn the screws of the rising hinges T so that t...

Страница 10: ...nels which are screwed onto the floor of the room in which the coldroom is assembled These are constructed such that they form a seal with the floor of the building During assembly the wall panels are...

Страница 11: ...Open the distributor s lead through opening and insert enclosed grommet Insert the power supply lead into the grommet and secure to L1 N and PE in the distributor Connect to power supply The power le...

Страница 12: ...m the side of the outside handle using a 2 5 mm hexagon key L Insert key H into the cylinder F turn to the horizontal position with turn and remove cylinder lock with key Install in reverse sequence T...

Страница 13: ...eaning the refrigeration unit and the coldroom should be cut off from the power supply Remove the plug from the power supply during such work and secure against the plug being reinserted or switch off...

Страница 14: ...adiation from the sun will increase power use Allow warm food to cool down to room temperature before placing it the coldroom Avoid keeping the door open for longer than necessary Monitor temperature...

Страница 15: ...ils of this technical documents serve for description Consents regarding the availability of certain features or regarding a certain purpose always require a special written agreement Page 15 GB Right...

Страница 16: ...Middle East FZE Telephone 971 43724247 refrigeration viessmann ae www viessmann ae United Kingdom Viessmann Refrigeration Systems Limited Telephone 44 1952 457157 sales viessmann coldtech co uk www v...

Отзывы:

Похожие инструкции для TectoCell Compact 100