4.  Electrical connections

 

   

 

   

 

   

Attention!

 

Work on the electrical network and protective measures

 

(FI-safety switch) is to be done by a specialist electrician

 

according to the current regulations (EN, ISO, VDE...) and 

 

conditions of the local energy supply company. 

 

The specialist electrical installation company will ensure 

 

professional installation and is responsible for checking

 

the operation and the safety of the sytem.

 
 

The electrical work must be done by a qualified 

 

electrician! 

 

In the lead going into the electrical distributor, there is a 

 

facility to ensure that all non grounded leads are separated

 

from the electrical power supply by at least 3 mm (plug or 

 

2 pole switch).

 

The lead type of at least H05VV-F3G1,5 or NYM-J 3x1.5 must

 

be used as long as no additional requirements for a higher

 

type exist.

 

Check that the cross section of the lead to the power supply

 

is secured.

 

Design is according to the Standard Door Panel Protective

 

Class II.

 

   

Attention!

 

While preparing of the connection to the power supply, it

 

must be ensured that the power supply is switched off 

 

and secured against switching on!

 

Push the lead through the coldroom ceiling. Protect from

 

sharp edges. Remove cover of distributor cap. Open the 

 

distributor‘s lead-through opening and insert enclosed 

 

grommet. Insert the power supply lead into the grommet and 

 

secure to L1, N and PE in the distributor. Connect to power 

 

supply.

 

The power lead must be firmly installed in the area of the 

 

coldroom.

 

Seal the grommet in the distributor box and the lid 

 

through-put opening with cold-setting putty. 

 

Switch on the power supply and check the working of the 

 

working of the electrical system.

 

   

 
 

   

Note!

 

  If the temperature drops and reaches a level of

 

  approx. 0°C, the thermal actuator in the distributor

 

  box of heated doors switches on the window and 

 

  valve heating and switches this off again if the 

 

  temperature rises and reaches approx. 7°C. The

 

  hysteresis range and the tolerance of the thermal

 

  actuator must be taken into account here.

 

 

If the junction box is located on the warm side, the 

 

  small thermostat will not switch the heating on. In this

 

  case, the heating must be connected directly without 

 

  the small thermostat. If the system is shut down or for

 

  coldroom operation in the positive range, the heating 

 

  must be disconnected.

Standflügelheizung

Fensterheizung Standflügel

Fensterheizung Gehflügel

zusätzl. DA-Ventil

Schwellenheizung

00048841-04

Bedientableau

Netzanschluß 230 V AC
50 Hz - bauseits

Schalter (2-polig)
mit Leuchtmelder
für Kühlzellen-
beleuchtung

Abzweig-
dose

Türrahmen-
heizung
(optional)

Netzanschluß 230V AC
über mehrpoligen Stecker

Türkontakt-
schalter
(optional)

Kühlzellen-
beleuchtung
(optional)

4

N

Druckaus-
gleichsventil
mit Beheizung
(optional)

3

N

L1

BK3

BK2

BK1

2

3

1

L1

N

N

3

Thermostat L1-4 nur bei Heizung

T

N

3

1

2

4

L1

BK1

BK2

BK3

BK4

BK5

5

6

N

 N

L1

L1

 PE

 PE

GNYE

 PE

PE

Wiring diagram, coldroom door

Содержание TectoCell Compact 100

Страница 1: ...o Any work on the electrical parts of the coldroom must be assembling or commissioning the unit Your specialist done by qualified electricians The plug must be separated refrigeration technician will...

Страница 2: ...embly 3 1 Connecting the coldroom panels 3 2 Assembly of the flooring panels 3 3 Assembly of the wall panels 3 4 Assembly of the door 3 5 Assembly of the ceiling panels 3 6 Assembly of the door thresh...

Страница 3: ...or installing a ceiling refrigeration unit or other elements such as hanging rails pipes etc additional support must be provided during assembly Attention During installation of the refrigeration uni...

Страница 4: ...ial prop construction Before starting to install the device check the dimensions of the intended place of installation With this also the right angularity has to be checked by diagonal measurement lt...

Страница 5: ...a distance of 200 to 300 mm from each other Ensure that the joins B and the exterior edges A are placed exactly on the flooring gratings lf there is unevenness in the flooring the flooring gratings mu...

Страница 6: ...be done carefully to prevent any and all penetration by water or contamination The individual coldroom elements are labelled The respec tive position of each coldroom element can be ascertained by com...

Страница 7: ...g panels with one or two sided connections fill the points marked on the drawing with sealant Do not place weight on the panel to be assembled Push the flooring panels together and tighten the externa...

Страница 8: ...the side section of the door frame or on the wall before installing the ceiling elements During installation ensure that the evaporator fan does not blow onto the door leaf and the pressure compensat...

Страница 9: ...the cap in order to release the cap locking After releasing the screw P or R the door can be adjusted horizontally or depthwise For vertical adjustment turn the screws of the rising hinges T so that t...

Страница 10: ...nels which are screwed onto the floor of the room in which the coldroom is assembled These are constructed such that they form a seal with the floor of the building During assembly the wall panels are...

Страница 11: ...Open the distributor s lead through opening and insert enclosed grommet Insert the power supply lead into the grommet and secure to L1 N and PE in the distributor Connect to power supply The power le...

Страница 12: ...m the side of the outside handle using a 2 5 mm hexagon key L Insert key H into the cylinder F turn to the horizontal position with turn and remove cylinder lock with key Install in reverse sequence T...

Страница 13: ...eaning the refrigeration unit and the coldroom should be cut off from the power supply Remove the plug from the power supply during such work and secure against the plug being reinserted or switch off...

Страница 14: ...adiation from the sun will increase power use Allow warm food to cool down to room temperature before placing it the coldroom Avoid keeping the door open for longer than necessary Monitor temperature...

Страница 15: ...ils of this technical documents serve for description Consents regarding the availability of certain features or regarding a certain purpose always require a special written agreement Page 15 GB Right...

Страница 16: ...Middle East FZE Telephone 971 43724247 refrigeration viessmann ae www viessmann ae United Kingdom Viessmann Refrigeration Systems Limited Telephone 44 1952 457157 sales viessmann coldtech co uk www v...

Отзывы:

Похожие инструкции для TectoCell Compact 100