Appendix
22
Notes
5
2
6
v
.5
Страница 1: ...oisoning resulting in injury or loss of life This product must be installed and serviced by a professional service technician who is experienced and qualified in hot water boiler installation and gas...
Страница 2: ...ements shut down procedure and the need for professional service annually before the heating season begins H Contaminated air Air contaminated by chemicals can cause by products in the combustion proc...
Страница 3: ...Product Delivery 4 Mounting Burner 5 Burner Set up Gas 6 Burner Set up Oil 10 Oil Cartridge Assembly 13 Burner Set up Gas and Oil 13 Start up Appendix Start up Information 14 Technical Data 15 Wiring...
Страница 4: ...tomatically Fired Boilers ANSI ASME CSD 1 where required by the authority having jurisdiction Working on the equipment The installation adjustment service and maintenance of this boiler must be done b...
Страница 5: ...Remove burner from carton The universal mounting flange has been installed on the burner at the factory 2 Mount burner as shown in Figs 1 and 2 5265 665 v2 5 Fig 1 Installing burner Fig 2 Securing bu...
Страница 6: ...l gas solenoid valve V8295 N C 24 V operated Dungs MVD LE model 200 G200 MVD LE 205 6 24 V G400 MVD LE 207 6 24 V Gas burner manifold test point Gas piping pressure test The burner and its gas connect...
Страница 7: ...ance regulator and set to required burner manifold pressure setting Use factory default settings pages 15 and 16 as starting point only 4 To adjust the initial lift gas pressure remove sealing cap exp...
Страница 8: ...r for both natural and propane gas Do not use other gas valve unless specified by Viessmann Field measured combustion results Use the combustion data label packed with the gas burner to record field m...
Страница 9: ...y supplied with a 40 N P 200 aftermarket conversion burner to that stated in the table below The differences in orifice size for the VB2 18 22 cause the manifold pressure adjustment information in the...
Страница 10: ...vided with its own oil filter and built in flow check valve The flow check valve is located in the return and a manual shut off is located in the supply One pipe systems 1 Connect as shown in Fig 6 52...
Страница 11: ...ront of the boiler Fig 8 3 Mount filter and check valve assembly to mounting bracket Fig 9 Filter is disposable type and must be replaced with the filter cartridge supplied by Viessmann 5265 665 v2 5...
Страница 12: ...s plug already installed ready for two pipe connection For a one pipe system gravity system where the oil tank is above the burner use the copper tee provided This tee converts the two pipe system to...
Страница 13: ...on Ensure an adequate supply of fresh combustion and ventilation air for safe operation Refer to codes mentioned on page 4 Electrical connections 1 Run the plug in connector cable of the Vitotronic co...
Страница 14: ...ler and barometric draft regulator before dilution air see the installation manual Overfire draft is measured at the combustion chamber observation port opening The expected CO2 products of combustion...
Страница 15: ...use unsafe conditions Viessmann strongly recommends the installation of an approved type CO detector in the vicinity of any gas burning equipment Observe national and or local code requirements If in...
Страница 16: ...lues can cause unsafe conditions Viessmann strongly recommends the installation of an approved type CO detector in the vicinity of any gas burning equipment Observe national and or local code requirem...
Страница 17: ...e Flow USGPH MBH 0 59 83 0 76 107 0 96 135 1 21 170 1 56 219 2 14 300 Pump Pressure psig kPa 150 1034 170 1172 145 1000 170 1122 165 1138 175 1207 Air Tube Length inches mm 10 254 10 254 10 254 10 254...
Страница 18: ...r 120 VAC is supplied to burner via plug in connector Do not connect additional 120 VAC to burner If any of the original wires as supplied with the appliance must be replaced replace with 221 F 105 C...
Страница 19: ...ate wiring harness strain relief to other electrical opening provided 3 Disconnect black wire BK of 7 pole plug from oil burner primary control base 4 Rewire wire nut included the black wire BK throug...
Страница 20: ...ch heating season begins have the following service and maintenance done by a licensed professional heating contractor 1 Boiler heat exchanger inspected and cleaned 2 Vent system inspected for deterio...
Страница 21: ...Appendix 21 Notes 5265 665 v2 5...
Страница 22: ...Appendix 22 Notes 5265 665 v2 5...
Страница 23: ...n D Do not use this appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas contro...
Страница 24: ...2 oil H BHP x 9 8 kW H BHP x 33779 Btu H m x 3 28 ft H m3 x 35 3 ft 3 H kcal x 3968 Btu H Cal value NG 950 1050 Btu ft 3 H Cal value LP 2450 2500 Btu ft 3 H Motor kW x 1 31 Motor HP NG Natural Gas LP...