Final testing
1.
Carry out the final tests according to
the information on pages 12 to 14.
2.
Record the actual values in the report
(on page 45).
Operating and service documents
1.
Complete and detach the customer
registration card:
■ Hand the system user their part for
safekeeping.
■ Retain the heating contractor's
part.
2.
File all parts lists, operating and serv-
ice instructions in the folder and hand
this over to the system user.
The installation instructions are no
longer required after installation and
therefore do not need to be
retained.