background image

 

1 General information 

Only specialists may set up and put into operation 
Köb solid fuel burners.  This will rule out any faulty 
installation or initial start-up.  These instructions 
are therefore limited to important technical data, 
references to ordinances, technical rules and other 
regulations. 
 
The PYROMAT DYN is a Burner Class 3 boiler for 
heating systems with hot water with a protection 
temperature of 110° C as per EN 303-5: 1999 
(heating boilers for solid fuels, manual and auto-
matically loaded combustion systems). 

1.1 

Technical standing 

The operating instructions comply with the PYRO-
MAT DYN at the time of its delivery.  In the interest 
of our customers, we reserve the right to make the 
following alterations as a result of technical devel-
opments, without being under obligation to give no-
tification of such. 

1.2 

Information documented 

The installation instructions contain the information 
required according to the EC Directive "Machinery 
98/37/EEC, Appendix 1, Number 1.7.4. 

2 Important information 

2.1 

Safety information 

The water-bearing and electrical installations as 
well as the chimney connection must be carried 
out by individuals authorised to do so, complying 
with all relevant standards and safety regulations. 

2.2 

Official permits 

The PYROMAT DYN has been inspected and ap-
proved in compliance with European Standard EN 
303-5:1999.  In addition, the PYROMAT DYN 
meets all European national deviations relating to 
tightened regulations relevant to emission limits 
and efficiencies: 
 

Austria: 

Art. 15a of the 

B-VG

 

"Agreement on the Saving of Energy" 
"Agreement on Protective Measures Concerning 
Small Furnaces" 
 
Federal Law Gazette 
Ordinance 331 
Furnace Ordinance 
FAV dated 18 Nov 1997, Part II 

 
 

 

Germany:

 

German Federal Emissions Control Act 
 
"Small Furnaces Ordinance, 1

st

 German Federal 

Emissions Control Act" dated 1997-03-14 
 

Switzerland: 

 
The Clean Air Act (or "

LRV

") dated 16 Dec 1985, 

incl. the amendment dated 20 Nov 1991 
 

Netherlands: 

NeR 
Dutch guideline on the incineration of clean rem-
nant wood of June 1995 

 

 

You can find out from your local building au-
thority whether the PYROMAT DYN requires an 
official permit.  This is why you should report 
there your installation of the PYROMAT DYN. 

 

2.3 

Standards and regulations 

-  Hot-water heating systems:  Safety equipment 

DIN 4751, ÖNORM B 8130 [Austrian standard], 
ÖNORM B 8131 [Austrian standard] 

-  Indoor chimneys:  Requirements for planning 

and design, DIN 18160 

-  Dimensioning of chimneys, DIN 4705, ÖNORM 

M7515 [Austrian standard] 

-  Heating system water:  preventing damage by 

corrosion and scale formation in hot-water heat-
ing systems, VDI 2035 

 

 

The regulations valid for the respective loca-
tion of installation must always be complied 
with. 

 

 
We will be glad to give you the sources on request 
for the standards and regulations cited.  If on 
stock, we will be glad to send these to you at cost 
price. 
 
 

Содержание KOB PYROMAT DYN 45

Страница 1: ...Instructions for Assembly and Installation PYROMAT DYN 45 to DYN 85 5726 786 GB 10 2009 Version 0 1 Please keep safe...

Страница 2: ...by K b Holzheizsysteme GmbH Flotzbachstra e 33 A 6922 Wolfurt All rights reserved including photomechanical re production and storage in electronic media Viessmann Group...

Страница 3: ...Automatically Triggering System for the Material Supply System ATSMS 7 7 2 2 Slide valve type MBA 7 7 2 3 Rotary valve type MBS 7 7 2 4 Double rotary valve with pressure compensation 7 7 3 Fire protec...

Страница 4: ...with European Standard EN 303 5 1999 In addition the PYROMAT DYN meets all European national deviations relating to tightened regulations relevant to emission limits and efficiencies Austria Art 15a...

Страница 5: ...AT DYN is equipped with an exhaust blower and so it is a fireplace not requiring a draft The design of the chimney should be carried out as for a fireplace with an oil or gas blast burner not requirin...

Страница 6: ...on the opposite side feed side Screw the lid tight to the motor and rod assembly and connect the electric line Run the squared shaft end from the de ashing agi tator through the drilled hole in the gr...

Страница 7: ...lid flange Unplug plugs 6 remove servomotor burner con trol valve 4 and unscrew screws on the rear wall 5 Light barrier ember monitoring system receiver EO98VB3S770 Abbreviated designation B 1G 2 Tran...

Страница 8: ...con densation of the exhaust gases the burner tem perature must in no case be less than 70 C For this a burner circuit pump should be provided with a boiler control valve according to the diagram Spec...

Страница 9: ...he fire protection regulations for wood heating systems vary for each specific country The regulations valid for the respective place of installation must be complied with 7 1 Protection for the burne...

Страница 10: ...pproved in non pressurised fuel storage units for all cases and according to TRVB 118 test certificate BV 2979 89 is considered as a suitable back burn safeguarding device 7 2 3 Rotary valve type MBS...

Страница 11: ...ty valve mounted on burner and or burner inlet 4 Thermal run off safety valve connected to the cold water mains 5 The sensor for the thermal run off safety valve is in the dipping shell 6 The containe...

Страница 12: ...ulating valve as per the diagram The burner circuit should be configured such that the temperature difference between the forward and return flow is equal to or less than 15 C This is given in the des...

Страница 13: ...P S 30 7 EM VXG48 40 SQS35 00 NW 50 R 1 NW 32 1 Connecting thread for inlet 2 Length of the exhaust pipe up to 4 0 m for longer lines see DIN 4751 Part 2 c Designation of the motors sensors and safety...

Страница 14: ...a burner circuit pump should be provided with a modulating valve as per the diagram The burner circuit should be configured such that the temperature difference between the forward and return flow is...

Страница 15: ...the motors sensors and safety switches Motors Electrical probes and sensors M1 Exhaust blower B1G 1 Transmitter light barrier for embers opposite slide in module M2 Feed auger B1G 2 Receiver light ba...

Страница 16: ...ted in metal 1 2 with fixed pipework K SLE and K SLV It must not be possible to shut off the cold water inlet without the aid of tools Be especially sure to comply with Point 5 of the Installation Ins...

Страница 17: ...y tap VBF 21 80 80 100 SQL 33 Counter flange seals ZH 3 100 7388165 3 way tap VBF 21 100 100 160 SQL 33 Counter flange seals ZH 3 125 7388053 3 way tap VBF 21 125 125 550 SQL 33 Counter flange seals P...

Страница 18: ...nection LVW 65 Art No LVW 65 V 7387862 Connecting two model LVW 65 manifolds produces a manifold for four to six consumer groups The connection is assembled at the factory to assure an accurate fit He...

Страница 19: ...leakage losses One ball valve with screwed connection for mounting on motor valve VXG 48 25 SSY 319 with pump connection on bottom One ball valve with thermometer socket and screwed connection with pu...

Страница 20: ...is transferred to the boiler water The vertical surfaces of the heat exchanger are regularly cleaned by motor driven moving coil springs The speed controlled exhaust blower was specially designed for...

Страница 21: ...tors refer to spec sheets Category 4 The operation of the heating control units is all carried out in the control module for the burner system Each controller is operated by a separate pushbutton For...

Страница 22: ...nal heat output g s 35 56 68 Average exhaust gas temperature at maximum nominal load C 138 136 134 Average exhaust gas temperature at minimum nominal load C 79 78 77 Maximum water content forest wood...

Страница 23: ...achstr 33 A 6922 Wolfurt Tel 43 5574 6770 0 Fax 65707 E Mail office kob cc Subject to technical changes 3010 4 2009 03 01_GB Dimensional drawing Feed auger available either left or right turning Right...

Страница 24: ...00 100 S Connection for exhaust blower 1 200 200 200 T Width of firebox 550 550 550 U Depth of firebox 300 400 400 W Outlet exhaust blower 293 293 293 Z Slide in module flange 650 765 800 a Connection...

Страница 25: ...r is insulated and cased in powder coated steel plate When operated according to the operating instructions dust emissions even when chips are incinerated are under 150 mg Nm based on 13 residual oxyg...

Страница 26: ...er ECO S1 1 1 2 4050 Controllers for solar systems Solar domestic water heating system ECO S3 1 2 2 4050 Modules and combinations possible see Spec Sheet 4020 Extra charge for control system module Ex...

Страница 27: ...th Extended Keyboard Art No ECO 13 7387820 A control module with an additional row of buttons to operate a maximum of 12 controllers PYROMAT DYN PYROT 13 controllers Pyromat ECO Data transmission line...

Страница 28: ...ol module in the heating room Version 2 Decentral control system module e g in annex building Only one control module possible Visualization with PC for extra cost please refer to Data Sheet 4090 Cont...

Страница 29: ...0 0 Fax 65707 E Mail office kob cc Subject to technical changes 4020 3 2009 03 01_GB Example of how to connect the CAN BUS cables for the PYROT Control system module 1 3 possible Visualization with PC...

Страница 30: ...nto operation the additional heat generator disconnects and the closed shut off valve prevents it from being flowed through The boiler temperature is variably regulated to a minimum temperature accord...

Страница 31: ...troller output for pump 1 mixing valve 2 and burner 3 Note Only for PYROMAT DYN without ECO function and PYROT with hydraulic switcher See Hydraulic Drawing 3950 PYROMAT ECO or 6960 PYROMAT DYN with E...

Страница 32: ...n for annex building Controller output for pump 1 mixing valve 1 and changeover valve 3 Flow sensor QAD 21 uninstalled Domestic water sensor QAZ 21 5220 with dipping shell x 200 mm uninstalled Thermos...

Страница 33: ...rerequisite The heating times day and week program can be adjusted via the integrated timer Scope of delivery Pushbutton for domestic water heater Controller output for pump 1 and shut off valve 2 Dom...

Страница 34: ...rcuit is for heating the heat accumulator at the back bottom and the third circuit is for heating the heat accumulator at the front top The heat accumulator is heated by an externally situated plate h...

Страница 35: ...n series T T T T M II IV 3 I 1 4 2 example 3 accumulators in series I solar collector II solar station with solar pump III thermostatic water mixer IV plate heat exchanger 1 solar pump 2 intlet valve...

Страница 36: ...customer Operating system Windows 98 2000 XP Available hard disk storage space at least 50 MB RAM at least 128 MB RAM Per boiler 1 available serial interface Visualisation Supplementary Function Art...

Страница 37: ...d Draining the heating room and silo room with all the ducts and shafts required for installing the entire facility e Unloading the scope of the delivery from the truck unless the delivery has been ex...

Страница 38: ...of the delivery Due to the great forces that develop this performance should be furnished according to the instructions of an expert architect or structural engineer in accordance with the supplier s...

Страница 39: ...2 Superfines dust wood particles smaller than 1 0 mm as per NORM M 7133 2 1 Without pre dryer max 10 0 of the total mass consequence of substantial overstepping of limit Temperature peaks Slag format...

Страница 40: ...remnants D 40 to 60 mm k1 S 650 less than W10 Pellets conforming to standards untreated D 6 to 10 mm k2 S 650 less than W10 Pellets conforming to standards untreated D 11 to 15 mm 6 Maximum water cont...

Страница 41: ...the technical clarification does not permit production on time for which the supplier is without blame the supplier is excused from the deadline commitment 3 The supplier is entitled to withhold the...

Страница 42: ...t in the fire proof coatings surface wear wear around the edges cracks etc that do not lead to any malfunction of the equipment are not covered by warranty New parts carry the stipulated new parts war...

Страница 43: ...e 73 23 EEC Low Voltage Directive 89 336 EEC EMC Directive 97 23 EC Pressure Equipment Directive Applied standards EN 303 5 DIN 4702 Solid fuel burners manual and automatic feeder systems EN 60335 1 A...

Страница 44: ...K b Holzheizsysteme GmbH Flotzbachstrasse 33 A 6922 Wolfurt Tel 43 55 74 67 70 0 Fax 43 55 74 65 7 07 office kob cc www kob cc Viessmann Group www viessmann com...

Отзывы: