3
Heat pump application limits ..................................................................
Occupational safety ...............................................................................
Electrical connections .........................................................................
Work on the heat pump ......................................................................
Work on the refrigerant circuit .............................................................
Product information ................................................................................
Vitocal 300-G/W Pro SPS ...................................................................
General information on electrical connection .........................................
Unloading and handling ......................................................................
Handling by crane ...............................................................................
Handling by forklift truck or pallet truck ............................................... 10
Installation room requirements ........................................................... 10
of the adjustable heat pump feet ........................... 12
Requirements for on-site connections ................................................ 14
Hydraulic connection requirements .................................................... 17
General hydraulic scheme .................................................................. 18
Levelling the heat pump ..................................................................... 21
Fitting the outer panels ....................................................................... 23
Hydraulically connecting the primary/secondary circuits ....................... 24
Connecting the primary circuit ............................................................ 27
Connecting the secondary circuit ....................................................... 27
Routing cables to the heat pump wiring chamber .................................. 28
Overview of electrical connections ........................................................ 29
Overview of electrical connections ..................................................... 30
Control circuit power supply (230 V~) and power circuit (400 V~) ..... 38
Power supply with power-OFF ........................................................... 39
Electronic soft starter, type SMC ........................................................ 39
Checking the electronic flow switch, type IFM ....................................... 41
Checking the electronic frost stat, type AC1-2W ................................... 42
Setting the frost stat switching points (if required) .............................. 43
Steps - commissioning, inspection and maintenance ............................ 45
Overview of electrical components ..................................................... 73
Draining the heat pump on the primary/secondary side ..................... 75
Checking sensors ............................................................................... 75
Checking MCBs/fuses ........................................................................ 76
Appliance too noisy ............................................................................ 76
Index
Index
5549 991 GB
Содержание 301.BS090
Страница 99: ...99 5549 991 GB...