
Open the adapter jaw.
Position the adapter jaw into the seat of the press ring.
Carry out the pressing process.
Open the adapter jaw and remove the press ring.
Remove the checking strip.
ð
The connection is marked as having been pressed.
3.4.4
Leakage test
The installer must perform a leakage test before commissioning.
This test is carried out on a system that is finished but not yet covered.
Observe the applicable regulations, see
Document the result.
Handling
Profipress G XL
22 from 23