Remove the checking strip.
ð
The connection is marked as having been pressed.
3.4.5
Leakage test
The installer must perform a leakage test before commissioning.
Carry out this test on a system that is finished but not yet covered.
Observe the applicable regulations, see
Ä
„Regulations from section:
Leakage test“ on page 7.
The leakage test pursuant to the applicable regulations must also be
carried out for non-drinking water installations, see
Ä
„Regulations from
section: Leakage test“ on page 7.
Document the result.
To prevent corrosion, the system must remain full of water
after the leakage test has been performed.
For the filling and top-up water, comply with the require-
ments specified in the applicable regulations, see
Ä
„Regu-
lations from section: Leakage test“ on page 7.
3.5
Disposal
Separate the product and packaging materials (e. g. paper, metal,
plastic or non-ferrous metals) and dispose of in accordance with valid
national legal requirements.
Handling
Megapress
32 from 32
Содержание Megapress
Страница 1: ...Year built from 10 2014 en_INT Megapress Instructions for Use ...
Страница 2: ...Megapress 2 from 32 ...