3.2.2
Preparing the installation
The following work stages and diagrams differ depending on
the cistern being used. The relevant steps are marked
accordingly.
Requirements:
n
The cistern is fitted into the pre-wall.
n
If external sensors are to be connected, the cables must be laid
through to the cistern.
n
The electrical connection is laid all the way into the cistern.
n
The pre-wall is tiled.
Cut into shaft cover.
Remove shaft cover.
Handling
WC flush actuation
20 from 48