3 Handling
3.1
Assembly information
3.1.1
Important note
Before assembly:
n
Check if the drainage capacity of the model chosen is sufficient for
the arising water volume
Chapter 2.2.3 „Drainage capacity“
n
In the case of the connection of two or three shower channels:
Observe the information for dimensioning of collective
lines
Chapter 2.2.3 „Drainage capacity“ on page 7
n
An adequate level of floor covering stability must be guaranteed
Chapter 2.3.3 „Technical data“ on page 9
either through an adequate screed thickness or another alternative
solution. Relevant measures must be considered before mounting.
n
The dimensions of slots and recesses must be in compliance with
„Regulations from section: Important
.
During assembly:
n
Observe installation dimensions.
n
Position the shower channel in such a way that the insert is remov‐
able.
After assembly:
n
The shower channel must be fully lined with mortar.
n
The sealing accessories should be given to the person responsible
for the bonded sealing (e.g. tiler).
n
Coordinate all relevant installation details, especially regarding the
bonded sealing, with those responsible for the subsequent work.
3.1.2
Tools and materials
n
Hand saw (saw blade maximum 1.5 mm)
n
Tool for removing the insert (e.g. model 4965.90, art. no. 689 704)
Special tools
Handling
Advantix Cleviva shower channel base unit (reconstruction model)
12 from 30