
Secure the drain in such a way that it cannot shift when the subse-
quent works are applied.
Most importantly, it must be ensured that the drain does not float
when the concrete or screed is poured in.
NOTICE!
Product damage due to improper installation
If hollow spaces occur during the lining of the drain, leaks
may occur when pressure is applied.
Inform the subsequent workers that the drain must be fully
lined and that there must be no hollow spaces.
Requirements
n
A pipe to the planned drainage position is already in place for the
connection to the waste water system.
n
The drain pipe has an internal sealing lip.
Position the drain on the floor and align horizontally.
Insert yellow protective plug.
Push the drain support into the drain pipe completely.
Installation in a bare concrete floor with levelling screed or heat insulation
Handling
Advantix Top bathroom drain
21 from 26