UPPER ROLL INSTALLATION
Clean the upper shaft to remove any dirt
before installation of the upper roll . Inspect the
roller bearing inside the upper roll for proper
lubrication and condition .
The upper roll must be installed before the
lower roll.
1.
Carefully insert the desired size upper roll
behind the slide/upper roll holder with the
markings on the upper roll facing outward .
2.
While supporting the upper roll, insert the
upper shaft into the slide/upper roll holder and
upper roll .
3.
Tighten the upper shaft retaining screw to
retain the upper roll on the upper shaft .
4.
Lubricate upper roll bearing with a
No . 2EP lithium-based grease . Refer to
the “Maintenance” section for additional
information .
LOWER ROLL INSTALLATION
Clean the main shaft and lower roll bore to
remove any dirt before installation of the lower
roll .
NOTE:
To aid in removing the lower roll at
a later time, apply a thin film of oil or grease
(anti-seize lubricant) to the main shaft before
installing the lower roll .
1.
Slide the desired size lower roll fully onto main
shaft with the marked side facing outward .
2.
Tighten the lower roll retaining nut completely
to retain the lower roll on the main shaft .
18
REV_C
TM-RG3212
/ Operating and Maintenance Instructions Manual