  797L Piezoelectric Accelerometer and Cable_Installation - Rev. 1

a) Uninsulated bearing

 

The housing of the accelerometer is connected
to ground: do not connect the cable shield-to-
ground at the monitored end.

Figure 3: Uninsulated bearing

b) Insulated bearing

The housing of the accelerometer is isolated
from ground: connect the cable shield-to-ground
at the monitored end.

Figure 4: Insulated bearing 

Step 3) Verification

1. Verify that the 797L piezoelectric accelerometer is functioning well: measure the voltage at the output of

the accelerometer (e.g. between black and white wires, at input of the PCU-100 unit). Note that the warm-
up time is about two minutes. The bias voltage (or voltage at rest) should be about 10 V

DC

 (+/- 1v).

2. Much lower or higher DC bias voltages indicate internal problems and the accelerometer should be

carefully packed and returned to the factory for repair.

Figure 5: Vibrations to bias voltage

Vibrations

t

Bias Voltage = 10V

DC

Содержание 797L

Страница 1: ......

Страница 2: ...Manual_Table of Contents Rev 1 797L Piezoelectric Accelerometer Installation Manual Product 9400 09M3A 101 This manual divides into the following sections Section 1 Installation of the Piezoelectric...

Страница 3: ...ications will require that the accelerometer be mounted on the same support structure and in the same axis as the proximity probe The 797L piezoelectric accelerometer is shipped with a captive screw f...

Страница 4: ...e great care in handling the Model 797L accelerometer NEVER DROP it or hit it against a solid object Keep it stored in its box until you have surveyed and prepared the location suitable for installati...

Страница 5: ...s of the coupling while over torquing can cause permanent thread damage Note Use Loctite 222 thread adhesive for better results Installation on an insulated bearing 1 Shown here is an alternate mounti...

Страница 6: ...006 5 797L Piezoelectric Accelerometer and Cable_Installation Rev 1 2 Glue is applied on the block and insulated surface 3 The sensor is held in place until the glue has set The sensor can be mounted...

Страница 7: ...n a protective conduit Step 1 Installation of the cable 1 Determine the run of the cable keeping in mind that its maximum length is 100 m 330 ft 2 Unroll the protective conduit following the planned c...

Страница 8: ...monitored end Figure 4 Insulated bearing Step 3 Verification 1 Verify that the 797L piezoelectric accelerometer is functioning well measure the voltage at the output of the accelerometer e g between b...

Страница 9: ......

Отзывы: