6

  797L Piezoelectric Accelerometer and Cable_Installation - Rev. 1

CABLE INSTALLATION

Preliminary considerations

This twisted pair, shielded, yellow teflon cable is 5 m (16 ft.) long
and will run between the piezoelectric accelerometer and the
PCU-100 Unit. 

In applications of 500 Hz maximum frequency such as the ones
this accelerometer is designed for, the cable capacitance of 30 pF
per foot allows the cable to run over a total length of 100 m (330
ft.). For applications involving a cable longer than 5 m (16 ft.), a
tapping box is needed.

The cable should be enclosed in a protective conduit.

Step 1) Installation of the cable

1. Determine the run of the cable, keeping in mind that its maximum length is 100 m (330 ft.).

2. Unroll the protective conduit following the planned course of the cable. Cut the conduit to desired length.

3. With a fish tape, carefully pull the cable into the conduit. The socket connector must be placed on the

accelerometer side.

4. Connect the cable to the accelerometer. 

5. Anchor the cable to reduce stress at

the cable terminations. When
securing the cable, leave enough
slack to allow free movement of the
accelerometer as shown in Figure 2.

Figure 2

Step 2) Connection of the power and output cable

1.  Connect the wires according to the following designation: 

PIN #

WIRE COLOR

DESIGNATION

A

White

Power/signal

Shell

Shield

Ground

B

Black

Common

Содержание 797L

Страница 1: ......

Страница 2: ...Manual_Table of Contents Rev 1 797L Piezoelectric Accelerometer Installation Manual Product 9400 09M3A 101 This manual divides into the following sections Section 1 Installation of the Piezoelectric...

Страница 3: ...ications will require that the accelerometer be mounted on the same support structure and in the same axis as the proximity probe The 797L piezoelectric accelerometer is shipped with a captive screw f...

Страница 4: ...e great care in handling the Model 797L accelerometer NEVER DROP it or hit it against a solid object Keep it stored in its box until you have surveyed and prepared the location suitable for installati...

Страница 5: ...s of the coupling while over torquing can cause permanent thread damage Note Use Loctite 222 thread adhesive for better results Installation on an insulated bearing 1 Shown here is an alternate mounti...

Страница 6: ...006 5 797L Piezoelectric Accelerometer and Cable_Installation Rev 1 2 Glue is applied on the block and insulated surface 3 The sensor is held in place until the glue has set The sensor can be mounted...

Страница 7: ...n a protective conduit Step 1 Installation of the cable 1 Determine the run of the cable keeping in mind that its maximum length is 100 m 330 ft 2 Unroll the protective conduit following the planned c...

Страница 8: ...monitored end Figure 4 Insulated bearing Step 3 Verification 1 Verify that the 797L piezoelectric accelerometer is functioning well measure the voltage at the output of the accelerometer e g between b...

Страница 9: ......

Отзывы: