Chapter 2
Setting up the system
Setting up the Job Manager
ONA-800 Getting Started Guide
Page 22
22142812, D1 R004
August 2020
unit. Clicking the button will start the application and open its work flow screen. With the
test plan you can also automatically load the configuration and profile of the test.
The Pass/Fail status is updated when the report for a planned test item is created. To
associate a report to a planned test item, you need to match the reference information
entered for the current test with the reference information specified in the desired
planned test item.
Selecting the
Create Summary Report
button allows the user to generate a report of
the test plan, including the associated report artifacts and the Pass/Fail status.
Selecting the Load Job button allows the user to load a new Job onto the instrument.
Attach a USB stick containing the job file and select Load Job to open the file dialog.
shows the Job Manager prepared to launch the next test.