background image

Parts list

Aggregate performance

60 Gbps

Power

-

Redundant power supply

Yes

Input frequency

50/60Hz

Input voltage

100V-240V Auto Select

Operational current (amps)

9.93

BTU/hr

4067

Operational voltage

120V

Power dissipation (watts)

1192

Relative humidity (non-condensing)

8% to 90%

Temperature (operating)

10°C ~ 35°C (50°F ~ 95°F)

Temperature (storage)

-40°C to 60°C (-40°F to 140°F)

Compliance

RoHS, FCC, CE

1.  

 For SFP, the SFP may be any of Copper 10/100/1000, 1Gb SX/LX. For SFP+, the SFP+ may be any

of 10Gb SR/LR. For QSFP+, the QSPF+ may be any 40Gb SR/LR/BiDi/Universal. For QSFP28, the

QSFP28 tranceivers may be SR4, LR4, or BIDI.

Parts list

Each appliance comes packed in a box or several boxes. The boxes contain the

various components necessary for a successful installation. The G4-60G-010-576T

appliance box contains the following components:

1 Head unit with RAID drives preinstalled

1 Rail kit

2 Power supply cables

2 Ethernet cables

2 External SAS cable

1 Product Activation Information envelope containing the product

license

1 Quick Start Guide

1 JBOD Units with 48 drives preinstalled

1 Label listing serial numbers of all JBODs for this system. This label

appears on top of the head unit and was attached to the outside of

the head unit’s box. Use this label to sort and connect the proper

JBODs to the head unit.

SFP transceivers (if ordered)

Before installing, ensure you received all of the parts required for your system.

Содержание G4-60G-010-576T

Страница 1: ...orage 576 TB Lights Out Management LOM Yes Redundant OS drive Yes OS drive hot swappable Yes OS drive size 1 TB RAID drive hot swappable Yes RAID version 60 Rail kit Yes Operating system Windows 2012 R2 Physical Height 8U Width 19 in Depth 26 5 in Weight with mounted rail kit or portable unit without a travel case 280 lbs Weight handling or portable unit in a travel case 295 lbs Media Monitoring i...

Страница 2: ... Parts list Each appliance comes packed in a box or several boxes The boxes contain the various components necessary for a successful installation The G4 60G 010 576T appliance box contains the following components 1 Head unit with RAID drives preinstalled 1 Rail kit 2 Power supply cables 2 Ethernet cables 2 External SAS cable 1 Product Activation Information envelope containing the product licens...

Страница 3: ... Caution Do not attempt in cabinet repairs of your appliance The appliance is very heavy Always use a server lift or work with a partner to install or remove the appliance from the cabinet to perform any maintenance 1 Mount the head unit and all JBODs in your cabinet Refer to the instructions on VIAVI Rail Kit page 11 2 Connect the cables Power SAS Ethernet TAP Span ...

Страница 4: ...3 Insert the transceivers 4 Connect the KVM 5 Turn on the JBODs Caution JBODs must be turned on before the head unit The drives do not properly initiallize if the JBODs are not started first If this happens restart the head unit 6 Turn on the head unit A1 7 Set the ip address ...

Страница 5: ...IPMI port provides you a dedicated management channel for device maintenance It allows you to monitor start stop and manage your appliance remotely regardless of whether the appliance is powered on 9 Install SFP transceivers page 7 1 into the open slots on the back of the capture card s 10 If you are connecting to SPAN mirror ports of a network switch connect a straight through Ethernet cable from...

Страница 6: ...P address page 7 for the ETH0 port shown as ETH0 in Network Connections in Windows using information supplied to you by your network administrator The default IP address 192 168 1 10 is printed on a sticker attached to the top of the appliance 16 Ensure the time zone settings match your environment 17 Optional Change the IPMI port page 8 in the BIOS using a static IP address provided by your netwo...

Страница 7: ...ses hot swappable SFPs but you should disconnect any cables before changing the SFP modules Caution Wear a grounding strap when handling SFPs to avoid damaging them or other components Avoid exposure to laser radiation from optical components by keeping the dust plugs installed until you are ready to install the cables Your transceivers can be inserted into any open port and in any order You can h...

Страница 8: ... network connection You interact with the hardware appliance through the Apex UI 1 Navigate to https hostname where hostname is the IP address or DNS name for the appliance 2 Log into the interface using the username admin and default password admin Configuring the LOM or IPMI port Your appliance comes with an on board LOM or IPMI port that provides you a dedicated management channel for device ma...

Страница 9: ...rs and select the second user account ADMIN account 10 Click Modify User and change the password 11 Optional Set up alerts There is no audible alarm if there is an issue with a power supply unit Other alerting options are available Each must be configured separately using details from your environment To receive email alerts change the settings at Configuration SMTP To receive SNMP traps change th...

Страница 10: ...ower supply issues 1 Directly connect using your host computer to the JBOD IPMI port using an Ethernet cable 2 On the host computer open a web browser to http 192 168 1 99 and log on with the user name ADMIN and password ADMIN in caps If you have trouble connecting see JBOD IPMI reset FAQ 3 Make changes as needed such as Change the ADMIN password Change the network configuration to use DHCP Set up...

Страница 11: ...ween 26 5 and 36 4 deep Caution Do not use a two post telco type rack 1 Identify the inner rack rails The chassis package includes one pair of rack rail assemblies in the rack mounting kit Each assembly consists of three sections an inner rail that secures directly to the chassis an outer rail that secures to the rack and a middle rail which extends from the outer rail These assemblies are specifi...

Страница 12: ...r rail all the way out Figure 9 Extending and releasing the inner rails Caution Do not pick up the server with the front handles They are designed to pull the system from a rack only 3 Install the inner rails on the chassis a Identify the left and right inner rails labeled b Place the inner rail firmly against the side of the chassis aligning the hooks on the side of the chassis with holes in the ...

Страница 13: ...able a Align the square pegs on the front end of the rail with the square holes on the front of the rack Push the rail into the rack until the quick release bracket snaps into place securing the rail to the tack Keep the rail horizontal b Adjust the rail to reach just past the full depth of your rack making sure that the rear bracket is level with the front bracket c Align the square pegs on the r...

Страница 14: ...ed to pull the system from a rack only This section provides information on installing a chassis into a rack unit with the rails provided There are a variety of rack units on the market so the assembly procedure may differ slightly Also refer to the installation instructions for your rack unit 1 Confirm that chassis includes the inner rails a also confirm that the outer rails b are installed on th...

Страница 15: ...le person to off load the heavy chassis from the rack without assistance Be sure to have sufficient assistance supporting the chassis when removing it from the rack Use a server lift 1 Pull the chassis forward out the front of the rack until it stops 2 Press the release latches on each of the inner rails downward simultaneously and move the chassis forward in the rack Figure 15 Removing the server...

Страница 16: ...r help North America 1 800 526 7919 South America 1 800 526 7919 EMEA 44 1 959 569 880 APAC 44 1 959 569 880 All Other Regions viavisolutions com contacts email nisupport viavisolutions com North South America uknisupport viavisolutions com EMEA APAC Support hours are 7 00 A M to 7 00 P M CST CDT for North and South America and 8 00 A M to 5 00 P M GMT EMEA and APAC ...

Отзывы: