2-Port Transmission Testing
64
If the power transmitted by the source is PT and the power received by the load is PR, then the insertion
loss is given by PR divided by PT. For maximum power transfer the insertion loss should be as small as
possible. In other words, the ratio PR/PT should be as close to one as possible, which in decibels means
as close to 0 dB as possible.
2 port transmission measurement screen
Preparing for a measurement
Selecting measurement mode
1
Tap
Single
under the
Mode & Measure
.
2
Double-tap the 2
Port Transmission
(
) icon.
NOTE:
You can choose two measurement modes from each window in the
Horizontal
or
Vertical
tab if you want to view dual measurements displayed on one screen.
Setting parameters
Содержание CAA06M
Страница 2: ...1 CAA06M Cable and Antenna Analyzer User s Guide ...
Страница 3: ......
Страница 9: ......
Страница 17: ...Introduction to CAA06M 8 ...
Страница 21: ......
Страница 27: ......
Страница 42: ...CAA06M User s Guide 33 ...
Страница 43: ......
Страница 52: ...CAA06M User s Guide 43 DTF VSWR Smith chart measurement screen vertical layout ...
Страница 53: ......
Страница 59: ...1 Port Cable Loss Testing 50 ...
Страница 65: ......
Страница 71: ...Smith Chart Testing 62 ...
Страница 77: ...2 Port Transmission Testing 68 ...
Страница 95: ...Appendix 86 ...