9
3
Electrical Panel installation
3.1
Installation of the Distributing Box
List of parts needed
1 pc
Switch box
1 pc
Installation Console (large)
1 pc
Installation Console (small)
16 pcs
Screw AM 5 x 8 mm
16 pcs
Rosette washer Ø 5,2 mm
1 pc
Cover plate HONEYWELL
2 pcs
Rubber bushing Ø 13 mm
10 pcs
Entry bushing PG 9
8 pcs
Entry Bushing PG 11
1 pc
Fuse box
1 pc
Tube fuse 4 A
1 pc
End piece of the tube PG 48
1 pc
Nut of the end piece of the tube PG 48
600 mm
Protection tube PG 48
1 pc
End piece of the tube PG 36
1 pc
Nut of the end piece of the tube PG 36
450 mm
Protection tube PG 36
1 pc
Ionization automatics
HONEYWELL S 4563B1011
2 pcs
Screw AM 4 x 8
1 pc
Bundle of conduits
Installation procedure
1.
With aid of 8 screws M5 with rosette washers, the installation console is to be mounted on a side portion of the jacket left cover B. Above,
a smaller console shall be installed to assist in securing the terminals.
2.
Sequentially, 8 pc of entry bushing PG11,to be mounted on the distribution box. Then, 8 pc of entry bushings PG9, end pieces of cover
tubes PG39 a PG48, a fuse box with 4A fuse, and two screws M5 are used to secure the cover HONEYWELL, containing already
installed from left two bushings PG9 and two rubber bushings Ø 13 mm.
3.
The box so equipped is to be mounted on a side part B left using four screws M5.
4.
At the box’s bottom on left, using two M4 screws, the ionization automatics HONEYWELL is to be fastened such, that the connector
leading to the igniter is orientated right down.
5.
The terminal X10 with conduits and suppression component Z1 is fastened into the lower portion of the installation console (Large) Anti-
jamming element is to be fastened using the fastener band to the console.
6.
Following the schematics, line wires 1, 2 are connected to the fuse box.
28
29