background image

 

17

P

P

ϑ

ϑ

ϑ

 

 

Elementary wiring diagram of VIADRUS G 90 – 10, 12, 15 sectional boiler for Honeywell version 

A

1

 

A

u

to

m

a

ti

c

s

 –

 H

o

n

e

y

w

e

ll 

4

5

6

3

B

1

0

1

1

 

E

1

 

Ig

n

it

io

n

 e

le

c

tr

o

d

e

 

E

2

 

Io

n

iz

a

ti

o

n

 e

le

c

tr

o

d

e

 

F

1

 

F

u

s

e

 4

 A

 

F

2

 

F

u

s

e

 2

,5

 A

 

H

1

 

S

ig

n

a

lli

n

g

 "

B

o

ile

u

n

d

e

v

o

lt

a

g

e

H

2

 

“f

a

ilu

re

” 

s

ig

n

a

lli

n

g

  

H

3

  

“i

o

n

is

in

g

 f

a

ilu

re

” 

s

ig

n

a

lli

n

g

  

S

1

 

M

a

in

 p

o

w

e

s

w

it

c

h

 

S

2

  

R

e

d

u

c

e

d

/r

a

te

d

 o

u

tp

u

s

w

it

c

h

  

S

3

 

P

u

s

h

b

u

tt

o

n

 R

E

S

E

T

 

X

1

0

 

B

o

ile

r’

s

 t

e

rm

in

a

p

la

te

 

Y

1

 

G

a

s

 V

a

lv

e

 H

o

n

e

y

w

e

ll 

V

R

4

6

0

1

Q

B

 2

0

0

1

 

Y

2

 

G

a

s

 V

a

lv

e

 H

o

n

e

y

w

e

ll 

V

R

4

6

0

5

Q

B

 2

0

0

2

 

Z

1

 

A

n

ti

-i

n

te

rf

e

re

n

c

e

 e

le

m

e

n

 

B

T

1

  

s

a

fe

ty

 t

h

e

rm

o

s

ta

B

T

2

  

c

o

m

b

u

s

ti

o

n

 p

ro

d

u

c

ts

 t

h

e

rm

o

s

ta

 

B

T

4

  

b

o

ile

th

e

rm

o

s

ta

 

P

S

3

 

M

in

im

a

w

a

te

le

v

e

g

u

a

rd

 

S

P

1

 

M

in

im

a

g

a

s

 p

re

s

s

u

re

 g

u

a

rd

 

S

P

2

 

G

a

s

 f

la

n

g

e

 l

e

a

k

ti

g

h

tn

e

s

s

 g

u

a

rd

  

X

6

X

7

 

G

a

s

 v

a

lv

e

 c

o

n

n

e

c

to

rs

 

 

 

Содержание G 90 10

Страница 1: ...VIADRUS G 90 Manual for assembly of boiler GB_ _ND 2015_26 GB_2017_23 ND...

Страница 2: ...al Panel installation 9 3 1 Installation of the Distributing Box 9 3 1 1 Electrical Panel installation 10 3 1 2 Completion of the Electrical Installation 10 3 2 Version 10 12 15 links automatics HONEY...

Страница 3: ...x kW 71 87 105 127 Rated thermal output min kW 55 61 73 94 Volume gas flow at the maximum thermal output m3 h 1 7 16 9 25 11 32 13 61 Volume gas flow at the minimum thermal output m3 h 1 5 56 6 5 7 85...

Страница 4: ...4 Number of sections 8 10 12 15 L mm 995 1155 1315 1555 L1 mm 815 975 1135 1375 A mm 878 5 941 941 941 D mm 200 200 225 250 Gas inlet...

Страница 5: ...boiler 18 22 28 pc boiler inserts as per boiler size 3 pc anchoring screws M 10 x L as per respective size 1 pc mounting brace 2 pcs cover sheet metal lid 6 pc of washer 10 1 pc of completed boiler p...

Страница 6: ...1 1 2 mount a complete distribution tube Into the threads G in the lower part of both end sections screw the outlet and inlet cocks Screw the cover sheet of the combustion chamber to the backside of...

Страница 7: ...sheet metal screws Note at the 8 section the horizontal draught diverter is compact Installation of the horizontal draught interrupter 2 5 Installation of burner List of parts needed 1 pc burner comp...

Страница 8: ...left side of the support in front fasten the side part of shell A left 2 into the riveting nut by means of 1 screw M5 and screw together by means of self drilling screws 4 2 with already fastened sid...

Страница 9: ...on a side portion of the jacket left cover B Above a smaller console shall be installed to assist in securing the terminals 2 Sequentially 8 pc of entry bushing PG11 to be mounted on the distribution...

Страница 10: ...nd piece of the tube PG 48 1 pc End piece of the tube PG 36 1 pc Nut of the end piece of the tube PG 36 Installation procedure 1 End pieces of the tubes PG36 and PG48 are to be fastened into the elect...

Страница 11: ...x 7 Further line wires No 10 11 15 22 27 28 45 and 55 are connected to the ionization automatics 8 The remaining line wires put through the end piece of the protective tube PG48 and then the actual tu...

Страница 12: ...6 1 pc Nut of the end piece of the tube PG 36 450 mm Protection tube PG 36 1 pc Ionization automatics HONEYWELL S 4563B1011 2 pcs Screw AM4 x 8 1 pc Bundle of conduits Installation procedure 1 With ai...

Страница 13: ...ody 6 Cable cover tube PG36 should be fastened into end pieces situated on the Distribution Box and the Electrical Panel Console 3 3 3 Completion of the Electrical Installation List of parts needed 1...

Страница 14: ...tion electrode F1 Fuse 4 A F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET...

Страница 15: ...on box A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressur...

Страница 16: ...electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety therm...

Страница 17: ...signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Honeywe...

Страница 18: ...eywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Honeywell VR4605QB 2002 Z1 Anti interference element PS3 Minimal water level guard SP1 Minima...

Страница 19: ...ion electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety t...

Страница 20: ...ge H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X10 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Ant...

Страница 21: ...utomatics Honeywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressure guard SP...

Страница 22: ...oduct innovation these might not be included in this Manual hereto presented E1 Ignition electrode E2 Small burner ionization electrode E3 Burner ionization electrode F2 Fuse 2 5 A H1 Signalling Boile...

Страница 23: ......

Страница 24: ...VIADRUS G 90 VIADRUS a s Bezru ova 300 E mail CZ 735 81 Bohum n info viadrus cz www viadrus cz...

Отзывы: