background image

 

11

3.2 

Version 10, 12, 15 links automatics HONEYWELL, valve HONEYWELL 

3.2.1 

Installation of the Distributing Box 

List of parts needed 

 

1 pc 

Switch box 

1 pc 

Installation Console (large) 

1 pc 

Installation Console (small) 

16 pcs 

Screw AM5x8mm 

16 pcs 

Rosette washer Ø 5,2mm 

1 pc 

Cover plate HONEYWELL 

2 pcs 

Rubber bushing Ø 13 mm 

2 pcs 

Entry bushing PG 9 

10 pcs 

Entry Bushing PG11 

1 pc 

Fuse box 

1 pc 

Tube fuse 4A 

1 pc 

End piece of the tube PG 48 

1 pc 

Nut of the end piece of the tube PG 48  

600 mm 

Protection tube PG 48 

1 pc 

End piece of the tube PG 36 

1 pc 

Nut of the end piece of the tube PG 36  

450 mm 

Protection tube PG 36 

1 pc 

Ionization automatics HONEYWELL  
S 4563B1011 

2 pcs 

Screw AM4 x 8 

1 pc 

Bundle of conduits  

 
Installation procedure 

 

1. 

With aid of 8 screws M5 with rosette washers, the installation console is to be mounted on a side portion of the jacket left cover B. Above, 
a smaller console shall be installed to assist in securing the terminals 

2. 

Sequentially, 8 pc of entry bushing PG11,to be mounted on the distribution box. Then, 8 pc of entry bushings PG9, end pieces of cover 
tubes PG39 a PG48, a fuse box with 4A fuse, and two screws M5 are used to secure the cover HONEYWELL, containing already installed 
from left two bushings PG9 and two rubber bushings Ø 13 mm. 

3. 

The box so equipped is to be mounted on a side part B left using four screws M5. 

4. 

At  the  box’s  bottom  on  left,  using  two  M4  screws,  the  ionization  automatics  HONEYWELL  is  to  be  fastened  such,  that  the  connector 
leading to the igniter is orientated right down. 

5. 

The terminal X10 with conduits and suppression component Z1 is fastened into the lower portion of the installation console (Large) Anti-
jamming element is to be fastened using the fastener band to the console. 

6. 

Following the schematics, line wires 1, 2 are connected to the fuse box 

7. 

Further line wires No.10,11,15,22,,27,28,45 and 55 are connected to the ionization automatics. 

8. 

The remaining line wires put through the end piece of the protective tube PG48, and then the actual tube is inserted over the conductors 

9. 

Line wire 90, connected to the igniting electrode, is to be inserted through the rubber bushing Ø 13

10.  Conduit no. 90, connected to the guardian electrode, is to be inserted through the rubber bushing Ø 13
11.  Conduit no. 92 to burner is to be iserted through bushing PG9
12.  Cable W1 is to be inserted through the last bushing PG9 and its conduits are to be connected in the distributing box as follows: 

Black  

J3: 2 

Brown  

X10: 23 

Grey  

X10: 24 

Blue  

X10: 5 

Green-yellow  

Terminal plate console 

13.  The cable W1 opposite end is to be connected to X6 gas valve connection outlet as follows: 

Black  

X6: L1 

Brown  

X6: L2 

Grey  

X6: L3 

Blue  

X6: N 

Green-yellow  

PE 

14.  The  outlet  X6  before  covering  is to be affixed using two self-cutting screws 2,9x19 onto a side piece under the distributing box. Cover it 

after its affixing. 

15.  Into the X6* gas valve connector are to be connected gas valve Y1 – X8.1 outlet cables. 
16.  (small 1

st

 step) and X8.2 (High-Low coil) as follows: 

X8.1 – Green – Yellow 

X6*: PE 

Blue  

X6*: N 

Brown 

6*: L2 

Black  

X6*: L1 

X8.2 – Green – Yellow  

X6*: PE 

Blue  

X6*: N 

Brown  

X6*: L3 

17.  Similarly are to be connected cable conduits of the Gas valve Y2 – X9.1 (1st step) and X9.2 (High-Low coil). 
 

3.2.2 

Electrical Panel installation 

List of parts needed 

 

1 pc 

Power module preconnected 

1 pc 

End piece of the tube PG 48 

1 pc 

Nut of the end piece of the tube PG 48 

1 pc 

End piece of the tube PG 36 

1 pc 

Nut of the end piece of the tube PG 36 

 

Installation procedure 

 

1. 

End pieces of the tubes PG36 and PG48 are to be fastened into the electrical panel console 

2. 

Wires are to be put through the end piece PG48, and the cover tube secured 

3. 

Following the connection schematics, instruments are to be connected within the power network module: 

BT2 – c.n.. 13,14,18,56 
BT1 – c.n. 15,17,18,57 
BT4 – c.n. 7,8,58 
S1 - c.n. 2,3 
H1 - c.n. 40 

Содержание G 90 10

Страница 1: ...VIADRUS G 90 Manual for assembly of boiler GB_ _ND 2015_26 GB_2017_23 ND...

Страница 2: ...al Panel installation 9 3 1 Installation of the Distributing Box 9 3 1 1 Electrical Panel installation 10 3 1 2 Completion of the Electrical Installation 10 3 2 Version 10 12 15 links automatics HONEY...

Страница 3: ...x kW 71 87 105 127 Rated thermal output min kW 55 61 73 94 Volume gas flow at the maximum thermal output m3 h 1 7 16 9 25 11 32 13 61 Volume gas flow at the minimum thermal output m3 h 1 5 56 6 5 7 85...

Страница 4: ...4 Number of sections 8 10 12 15 L mm 995 1155 1315 1555 L1 mm 815 975 1135 1375 A mm 878 5 941 941 941 D mm 200 200 225 250 Gas inlet...

Страница 5: ...boiler 18 22 28 pc boiler inserts as per boiler size 3 pc anchoring screws M 10 x L as per respective size 1 pc mounting brace 2 pcs cover sheet metal lid 6 pc of washer 10 1 pc of completed boiler p...

Страница 6: ...1 1 2 mount a complete distribution tube Into the threads G in the lower part of both end sections screw the outlet and inlet cocks Screw the cover sheet of the combustion chamber to the backside of...

Страница 7: ...sheet metal screws Note at the 8 section the horizontal draught diverter is compact Installation of the horizontal draught interrupter 2 5 Installation of burner List of parts needed 1 pc burner comp...

Страница 8: ...left side of the support in front fasten the side part of shell A left 2 into the riveting nut by means of 1 screw M5 and screw together by means of self drilling screws 4 2 with already fastened sid...

Страница 9: ...on a side portion of the jacket left cover B Above a smaller console shall be installed to assist in securing the terminals 2 Sequentially 8 pc of entry bushing PG11 to be mounted on the distribution...

Страница 10: ...nd piece of the tube PG 48 1 pc End piece of the tube PG 36 1 pc Nut of the end piece of the tube PG 36 Installation procedure 1 End pieces of the tubes PG36 and PG48 are to be fastened into the elect...

Страница 11: ...x 7 Further line wires No 10 11 15 22 27 28 45 and 55 are connected to the ionization automatics 8 The remaining line wires put through the end piece of the protective tube PG48 and then the actual tu...

Страница 12: ...6 1 pc Nut of the end piece of the tube PG 36 450 mm Protection tube PG 36 1 pc Ionization automatics HONEYWELL S 4563B1011 2 pcs Screw AM4 x 8 1 pc Bundle of conduits Installation procedure 1 With ai...

Страница 13: ...ody 6 Cable cover tube PG36 should be fastened into end pieces situated on the Distribution Box and the Electrical Panel Console 3 3 3 Completion of the Electrical Installation List of parts needed 1...

Страница 14: ...tion electrode F1 Fuse 4 A F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET...

Страница 15: ...on box A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressur...

Страница 16: ...electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety therm...

Страница 17: ...signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Honeywe...

Страница 18: ...eywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Honeywell VR4605QB 2002 Z1 Anti interference element PS3 Minimal water level guard SP1 Minima...

Страница 19: ...ion electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety t...

Страница 20: ...ge H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X10 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Ant...

Страница 21: ...utomatics Honeywell 4563B1011 F1 Fuse 4 A X10 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressure guard SP...

Страница 22: ...oduct innovation these might not be included in this Manual hereto presented E1 Ignition electrode E2 Small burner ionization electrode E3 Burner ionization electrode F2 Fuse 2 5 A H1 Signalling Boile...

Страница 23: ......

Страница 24: ...VIADRUS G 90 VIADRUS a s Bezru ova 300 E mail CZ 735 81 Bohum n info viadrus cz www viadrus cz...

Отзывы: