02/2017
www.vgebv.nl
8/18
Manual for:
VGE Pro UV Control 400/420/600 and VGE Pro UV Control 140/200
EP600001, EP200002
4 Wiring
• Make sure that the mains voltage is within the tolerances given in the data sheet.
• Make sure that imbalances in 3 phase mains supply will not lead to mains voltage outside the specified range.
• We recommend slow-blow lead fuses for protection. For fuse rating we recommend the specified 'max. input current
value' plus at least 15%.
Note:
After connecting to mains, the inrush current may reach high values of up to 120A in the first µs.
If lamps are lit, the mains current increases to the specified 'input current' value.
X1 supply voltage terminal
230V AC +/-10%
X2 main switch terminal
(for bipolar main switches)
contacts have to be closed as shown
to power system
X3 / X4 / X5 lamp terminals
the connection wires to the lamp electrodes
must never be mixed up
1 = white
2 = red
3 = brown
4 = black
X6 relays 1/2/3/4
1 s OK
2 warning
3 alarm
4 reserve
X7 digital sensor terminal
1 = brown
2 = white
3 = blue
4 = black
X8 UV diode sensor terminal
1 = blue
2 = black
X9 current input terminal
including 12V DC supply for external module
X10 current output terminal
X11 temperature sensor terminal
including ground connector for cable shield
X12 RS485 terminal modbus
including ground connector for cable shield
X13 (Flow) switch 2 terminal
including 12V DC supply for external module function
depends on operating software
For connecting a passive switch use 1 and 2
X14 control panel terminal
standard RJ-45 connector, use CAT5e patch cable
X15 switch 1 terminal
apply 100...250V AC for remote start, if function is enabled
X18 interlock 1
contacts have to be closed as shown
to enable ballast function and to power ballast section
S1 lamp status LEDs for lamps A/B/C
solid green: lamp operation OK
green blinking: filament preheating
solid red: lamp fault
S2 system status LEDs
1. interlock terminal contacts closed
2. connection to frontend
- fast blinking: OK
- slow blinking: fault
3. modbus communication
4. switch 1: activated (voltage 100...250V AC present)
5. switch 2: activated (contacts A-B closed)
S3 ballast status
ballast section activated
S4 DIPswitch
factory service, all switches have to be set to
‚off‘