![VERVIEW OVU00106 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/verview/ovu00106/ovu00106_technical-manual_1008500017.webp)
This is the property of Overview Limited, no copying without permission
except as permitted by copyright law
23 May 2013
17
Address Switches Settings and Controller Protocols
The address switches are used to set up the controller protocol and the unit ID of each Dome. There are 255
unit ID’s and a maximum of 32 control protocols. The following figures and tables outline how to set up
address switches on a unit.
Address switches S1, S2 and S3 (shown in Fig 13) are used to set up the unit ID and the controller protocol. S1
and S2 are hex switches used to set the unit ID and S3 (Fig 14) is used to set up the controller protocol.
S1 S2 S3
Fig 13
Top view of the address switches
ON
1 2 3
Fig 14
Plan view of S3
4 5 6 7 8