Vertiv™ NetSure™ External Distribution Box (EDB) Description and Installation Manual 

Proprietary and Confidential © 2022 Vertiv Group Corp. 

15 

 

Electrician’s insulated screwdrivers, Phillips, No. 1 and 2. 

 

Electrician’s insulated screwdrivers, flat-blade, small and large. 

 

Silicone sealant. 

 

Duct putty. 

 

NO-OX-ID-A or approved equivalent. 

 

NOTE!

  Outside the scope of this document, are the tools to fish, splice and terminate OSP Cables. 

 

6

 

Transportation and Storage 

6.1

 

Important Safety Instructions 

Read the “Important Safety Instructions” starting on page vi. 

6.2

 

Transportation 

All enclosures can be purchased for field installation.  Field installed units are shipped on a pallet. 

6.3

 

Storage 

To avoid possible damage to the unit, the enclosure should always be shipped and stored on the pallet. 

Storage Ambient Temperature Range:  See “Environmental” on page 4. 

7

 

Mounting the Enclosure 

 

NOTE!  

Unit must be mounted at a height no greater than 2 meters from the bottom of the unit to ground. 

 

7.1

 

Important Safety Instructions 

 

DANGER!  

Adhere to the “Important Safety Instructions” starting on page vi. 

 

7.2

 

Specific Safety Precautions 

 

ALERT!  

To avoid possible damage to the enclosure, do not remove the packaging or pallet from the enclosure until it is 

delivered to the installation or staging site.  Control moisture and condensation inside the enclosure until it is turned up for 
service. 

 

ALERT!  

Do not stack enclosures while in transportation or storage as damage may result. 

 

7.3

 

General 

The enclosure is to be mounted on the side of a companion enclosure made of a minimum of 0.125-inch aluminum or 14-gauge 
galvanized steel.  The companion enclosure must be installed (according to local practices) before this enclosure can be installed. 

Equipment is intended for installation in a Restricted Access Area. 

Содержание NetSure F1011259

Страница 1: ...NetSure External Distribution Box EDB Description and Installation Manual Specification Number F1011259 F1011265 F1011266...

Страница 2: ...d in performing procedures not specifically described in this document The products covered by this instruction manual are manufactured and or sold by Vertiv This document is the property of Vertiv an...

Страница 3: ...General 10 4 Front Doors and Locks 11 4 1 Important Safety Instructions 11 4 2 Front Doors 11 4 3 Opening and Closing the Enclosure Front Doors 11 5 Installation Considerations 14 5 1 Installation Ov...

Страница 4: ...e Fiber Leads to the Fiber Termination Blocks 22 11 6 Connecting Alarm and LVD Low Voltage Disconnect Cables 24 11 7 Connecting Fiber Cables to the Enclosure 31 11 7 1 Optical Fiber Cables Precautions...

Страница 5: ...inor or moderate injury if not avoided ANSI OSHA This admonition is not used for situations that pose a risk only to equipment data or service even if such use appears to be permitted in some of the a...

Страница 6: ...usly high the DC source can deliver large amounts of current Exercise extreme caution not to inadvertently contact or have any tool inadvertently contact an input or output terminal or exposed wire co...

Страница 7: ...nsulation of field wire conductors should be rated no less than 90 C and sized in a manner that is consistent with the NEC and local codes Always use an approved voltage detector when approaching an e...

Страница 8: ...is damaged do not accept receipt from the shipper DANGER RISK OF ELECTRICAL SHOCK AC Proper actions include but not limited to a Verify before contacting the enclosure that no current leakage or groun...

Страница 9: ...can present harmful chemicals Refer to the battery installation manuals and MSDS supplied with the batteries Work in a ventilated area and follow all safety procedures At a minimum wear safety glasses...

Страница 10: ...Vertiv NetSure External Distribution Box EDB Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp x This page intentionally left blank...

Страница 11: ...age Disconnect LVD contactor on the left side DC distribution panel s DC input Spec No F1011266 contains Low Voltage Disconnect LVD contactors on the left side and right side DC distribution panels DC...

Страница 12: ...e External Distribution Box EDB Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 2 Figure 2 1 Vertiv NetSure External Distribution Box EDB Overall Views Front Fr...

Страница 13: ...101599 15 1 1 102276 101600 20 1 1 102277 101601 25 1 1 102278 101602 30 1 1 102279 101603 35 1 1 102280 101604 40 1 1 102281 101605 45 1 1 121998 121997 50 1 1 102282 101606 60 1 1 102283 101607 Cir...

Страница 14: ...erating in an altitude range of 0 feet to 10 000 feet 2 4 3 Compliance information The Vertiv NetSure External Distribution Box EDB complies with the following standards UL Listed to UL 62368 1 2nd Ed...

Страница 15: ...Vertiv Group Corp 5 Figure 2 2 Enclosure Dimensions 2 3 4 inch trade size knockouts 1 125 inch actual diameter 4 2 inch trade size knockouts 2 5 inch actual diameter 10 2 50 inch cable grommets 8 1 7...

Страница 16: ...o be mounted to the side of a companion enclosure Exterior Finish The enclosure is finished in multistage dry powder polyester paint cool white for maximum durability and performance against corrosion...

Страница 17: ...5 position main ground bar is located inside of the enclosure The main ground bar is mounted on isolators The default ground lug geometry is two hole with 1 4 inch post and 5 8 inch spacing Low Voltag...

Страница 18: ...Proprietary and Confidential 2022 Vertiv Group Corp 8 Figure 2 4 Perspective Views with Major Features Identified cont d on next page Drain Holes Cable Entry Grommets Cable Entry Grommets Front Door F...

Страница 19: ...istribution panel s DC input Spec No F1011266 contains Low Voltage Disconnect LVD contactors on the left side and right side DC distribution panels DC input Spec No F1011259 contains no Low Voltage Di...

Страница 20: ...e enclosure Front Doors and Locks 11 Describes how to access the inside of the enclosure Installation Considerations 14 Provides installation overview and recommended tools and test equipment Transpor...

Страница 21: ...andle hex w pin security tool to unlock the door 4 Lift the swing latch and rotate approximately 90 clockwise for the left side door and approximately 90 counterclockwise for the right side door to di...

Страница 22: ...Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 12 Figure 4 1 Front Door Swing Latch Front Left Side Door Front Right Side Door Door Swing Handle Locked Positi...

Страница 23: ...on Box EDB Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 13 Figure 4 2 Enclosure s Left Side Front Door Wind Latch Wind Latch Bar 90 Position 120 Position 120...

Страница 24: ...uipment and materials have been delivered Proceed with the physical installation of the enclosure Install circuit breakers inside the enclosure Install and verify enclosure grounding cable Connect and...

Страница 25: ...ient Temperature Range See Environmental on page 4 7 Mounting the Enclosure NOTE Unit must be mounted at a height no greater than 2 meters from the bottom of the unit to ground 7 1 Important Safety In...

Страница 26: ...ed with the installation DO NOT REMOVE THE PALLET UNTIL THE ENCLOSURE IS READY TO BE MOUNTED 7 5 Mounting the Enclosure on the Outside of a Companion Enclosure Perform the following steps to install t...

Страница 27: ...larm terminal on the spring strip Push distribution device in firmly until fully seated in the distribution panel 3 Record all circuit breaker sizes on the labels provided 4 Close the left front door...

Страница 28: ...Refer to Figure 9 1 for location and recommended torque Procedure 1 Install a 2 AWG cable from this termination to the platform site ground 9 4 Main Ground Bar A main ground bar is located inside the...

Страница 29: ...Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 19 Figure 9 2 Enclosure Main Ground Bar Location Main Ground Bar 1 4 20 Bolt with washer 1 4 Flat Washer Recommended Torque 60...

Страница 30: ...r cable entry and fiber exit along with two 2 3 4 inch trade size knockouts for alarm wiring Refer to Figure 10 1 The DC distribution and fiber chambers provide tie wrap lance panels on both side wall...

Страница 31: ...r leads are routed up through the second level of grommets into the DC distribution chamber of the enclosure These are than connected to the load circuit breakers and return bars The trunk cable fiber...

Страница 32: ...he following procedure Procedure WARNING Observe proper polarity when making connections 1 Verify each DC distribution circuit breaker is in the OFF position 2 Remove the DC distribution panel shield...

Страница 33: ...for clarity only Front 48 VDC 58 VDC Load and Return Connections 1 4 20 Studs on 5 8 Centers Customer must supply or order additional hardware Maximum Lug Width 0 625 inches Recommended Torque 72 in...

Страница 34: ...the cabling route into the enclosure for your installation site See also Cable Routing on page 20 3 Pull the alarm and LVD cables into the bottom of the enclosure through the provided grommets and rou...

Страница 35: ...Vertiv NetSure External Distribution Box EDB Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 25 Figure 11 3 Alarm Block Connections F1011259...

Страница 36: ...Vertiv NetSure External Distribution Box EDB Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 26 Figure 11 4 Alarm Block Connections F1011265...

Страница 37: ...Vertiv NetSure External Distribution Box EDB Description and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp 27 Figure 11 5 Alarm Block Connections F1011266...

Страница 38: ...Wire Slate Wire to Slate Wire Blue White Wire to Blue White Wire P N 60031372 Rear Vertiv NetSure 512 DC Power System Spec No 582137000 List 27 582137000ZZ007 Shown Others Similar Notes 1 Factory inst...

Страница 39: ...26 582137100ZZ028 Shown Others Similar Notes 1 Factory installs links on the factory wiring side of terminal Factory Wiring Side Customer Wiring Side LVD LVD LVD AUX Contacts CBA Alarm Signal to DC P...

Страница 40: ...rs Similar Notes 1 Factory installs links on the factory wiring side of terminal Factory Wiring Side Customer Wiring Side LVD LVD LVD AUX Contacts CBA Alarm Signal to DC Power System Digital Input LVD...

Страница 41: ...8 VDC 58 VDC is provided at terminal 1 of J3 Figure 11 9 Alarm Circuit Cards P N 541183 Locations 11 7 Connecting Fiber Cables to the Enclosure 11 7 1 Optical Fiber Cables Precautions When you work wi...

Страница 42: ...3 and seal all cable grommets 11 8 Connecting 48 VDC 58 VDC Input Power to the Enclosure WARNING Observe proper polarity when making connections DC input power leads are connected to the input busbars...

Страница 43: ...cable interfaces into the enclosure must be properly sealed after installation of cables Procedure 1 Seal all cable entries with duct putty after passing cables through the cable grommets 48 VDC 58 V...

Страница 44: ...ify all circuit breakers inside the enclosure are Off 3 Verify no open power leads are present 4 Verify all cables and connections are secure 5 Apply DC input power to the enclosure 6 Use an approved...

Страница 45: ...Ice and snow should be removed from the front door and all ventilation areas Practices and tools to avoid include use of salt use of ice scraper screwdrivers or other tools that would dig into the ice...

Страница 46: ...0 800 1280 option 2 SPARE PARTS Email DCpower Spares Vertiv com OSP Spares Vertiv com Pricing and purchase orders for spare parts including but not limited to breakers cables fuses rectifier fans misc...

Страница 47: ...ription and Installation Manual Proprietary and Confidential 2022 Vertiv Group Corp Connect with Vertiv on Social Media https www facebook com vertivI https www instagram com vertiv https www linkedin...

Страница 48: ...s or registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness here Vertiv Group Corp assumes no responsibility and disclaims all liabi...

Отзывы: