Mechanical Installation
19
2.11. Mechanical Installation Checklist
Initiate the inspection checks after the mechanical installation is completed. Pre-check and confirm that there are no
discrepancies or faults. Ensure that all the points in the checklist (refer
for installation checklist) are complying
accordingly.
Table 2-5 Mechanical Installation Checklist
Check Items
Results
Reserve maintenance space for easy equipment maintenance.
The ceiling-mounted unit is installed horizontally, and the installing fasteners parts have been
locked firmly.
The connecting pipe between the main unit and the terminal has been properly installed, and the
engineering ball valve in the terminal has been fully opened.
Condensate drain piping is connected properly.
All piping joints are rigidly tightened.
Piping fasteners are checked and fixed reliably.
After the unit is installed, the debris and external materials inside or around the unit have been
removed (such as transportation materials, mechanical parts materials, tools, etc.)
After the unit is installed, the debris and external materials inside or around the unit must be
removed (such as transportation materials, mechanical parts materials, tools, etc.)
Everything is checked and verified, follow the electrical installation.